How Long Does an ADU Permit Take in Your City?
Pick your city to see how long plan check takes, how that compares with the rest of your state, what permits cost and which office to contact.
We could not load city data just now. Please refresh the page.
Your timeline
Pick a state and city to see your numbers.
Plan check in your city
Free. We check your own lot against your city's rules.
Planning figures for comparing options. Not a construction quote, an appraisal or a promise of rent. A licensed builder's bid and your city's plan check set the real numbers.
How we calculate this
The plan check figure is the number of weeks we have on file for your city, from the dataset behind our city pages (617 cities, seven states). Where a city does not publish a review time, the figure is estimated from similar cities, and the result says so. If we have nothing for your city, we show your state's average.
"Drawings to permit" adds the time to produce the drawings to the plan check time. We use 2 weeks for drawings, which is our own turnaround of 10 business days. If you already have a set ready to submit, choose that option and the drawing time drops out.
The comparison shows your city next to the fastest city, the slowest city and the average for your state, all from the same data.
What the figure does not include
- Rounds of corrections. Cities do not publish how many a typical project needs.
- Separate reviews, such as design review in a historic district, a coastal permit, or county health review for a septic system.
- Utility company work, such as a new meter or a panel upgrade.
- Construction itself, which starts after the permit is issued.
Whether any of those apply depends on your address. The free property audit checks your lot, and the ADU size calculator shows what your setbacks allow.
Common questions
How long does an ADU permit take?
It depends on the city. Across the 617 cities we track, plan check runs from under two weeks to several months, with an average of about seven and a half weeks. Look up your city above for the figure on file.
What is plan check?
The city's review of your drawings against the zoning and building codes before it issues a permit. Reviewers from planning, building and sometimes fire and public works each look at the set. If they have comments, you correct the drawings and resubmit.
Is there a legal deadline for ADU permits in California?
Yes. California law requires a city to approve or deny a complete ADU application within 60 days. The clock starts when the application is complete, so missing documents or corrections can still stretch the total.
What slows a permit down most?
An incomplete first submittal. Each round of corrections adds a review cycle. Design review in a historic or coastal area, a septic system, and utility upgrades are the other common causes. A complete, code-checked set of drawings is the part you control.
How much do ADU permits cost?
Fees vary widely by city and by the size of the unit. The lookup shows the range on file for your city. In California, units under 750 square feet are exempt from impact fees, which is often the largest fee.
Can I start building before the permit is issued?
No. Work that needs a permit cannot start until the permit is issued. You can use the waiting time to get builder bids and line up financing.
More free tools
See all free toolsA calculator uses city averages. Your lot is not average.
The free property audit looks at your own address: your lot lines, your setbacks and what fits behind your house. We won't take any money unless your property qualifies.
Get my free property audit