State & City Guides November 6, 2026 · 10 min read

Washington State ADU Rules & Costs (2026): HB 1337 Guide for Seattle, Bellevue & Tacoma

Washington State's landmark HB 1337 (RCW 36.70A.681) requires cities inside Urban Growth Areas to allow two ADUs per single-family lot, eliminates owner-occupancy mandates, and caps impact fees at 50%. Compare 2026 rules and costs across Seattle, Bellevue, Tacoma, Vancouver, and Spokane.

MR
AutoCAD & Chief Architect Certified

Lead Architectural Designer · Build With A Plan

Marcus has delivered 50+ permit-ready drawing sets for ADUs, garage conversions, and home additions across California, Texas, Arizona, Florida, and Oregon.

Washington State ADU Rules & Costs (2026): HB 1337 Guide for Seattle, Bellevue & Tacoma

Quick Answer: Washington State ADU Rules (2026)

Under Washington House Bill 1337 (RCW 36.70A.681), now fully in effect across every Growth Management Act (GMA) city in 2026, homeowners on single-family lots inside an Urban Growth Area can build up to two ADUs per lot (in any combination of attached or detached units). Cities must allow ADUs of at least 1,000 square feet, cannot require the homeowner to live on-site, cannot charge impact fees above 50% of the single-family rate, and cannot force you to pay for public street or sidewalk improvements. Turnkey ADU construction in Washington ranges from $200 to $380 per sq ft in Spokane, Vancouver, and Tacoma to $385 to $630 per sq ft in Seattle and Bellevue.

2 ADUs / Lot
Statewide HB 1337 Right
1,000 to 1,200
Max Size (Sq Ft)
50% Cap
Max City Impact Fee
$1,496 to $2,664
Median 1-BR Monthly Rent

1. What Washington HB 1337 (RCW 36.70A.681) Mandates in 2026

Washington State passed Engrossed Substitute House Bill 1337 (codified at RCW 36.70A.680 and RCW 36.70A.681) to end restrictive suburban zoning rules that blocked backyard cottages (often called DADUs, or Detached Accessory Dwelling Units, in the Puget Sound region). Because the statutory compliance deadline for King, Pierce, Snohomish, Kitsap, Clark, and Spokane counties has now passed, HB 1337 preempts conflicting local municipal codes statewide inside Urban Growth Areas in 2026.

Here are the seven rights every qualifying Washington homeowner now holds under state law:

  1. Two ADUs Per Lot (Attached or Detached): Every residential lot that meets the minimum lot size for a single-family home is allowed two ADUs. You can build one attached basement/garage ADU plus one detached backyard cottage, two detached cottages, or convert an existing garage into a unit and build a second new unit.
  2. 1,000 Sq Ft Minimum Size Ceiling: No city or county can cap an ADU's gross floor area below 1,000 square feet (and several cities, including Bellevue, Kirkland, Sammamish, and Edmonds, allow up to 1,200 square feet).
  3. 24-Foot Minimum Roof Height: Cities cannot set a roof height limit lower than 24 feet for detached ADUs, which makes two-story carriage houses and backyard cottages legal across the state.
  4. No Owner-Occupancy Requirement: Cities are prohibited from requiring the property owner to live in either the main house or the ADU. You can rent out the main house and both ADUs simultaneously.
  5. 50% Cap on Impact Fees: Municipal school, park, and traffic impact fees on an ADU cannot exceed 50% of the impact fee charged to a standard single-family home.
  6. Zero Street Improvement Mandates: Cities can no longer force you to repave the street, install new curbs, or widen public sidewalks as a condition of getting an ADU building permit.
  7. Right to Sell ADUs Separately as Condominiums: Cities cannot prohibit the sale or other conveyance of an ADU as an independent condominium unit separate from the main house.

2. 2026 Washington ADU Rules by City: 10-Market Comparison Table

The table below compiles verified 2026 municipal regulations, construction cost ranges, plan check timelines, and rental income data from our Washington ADU database. Click any city to view its detailed local page.

Washington City Max ADU Size Max Height Side / Rear Setback Build Cost / Sq Ft Plan Check Timeline Permit Fee Range Median 1-BR ADU Rent
Seattle 1,000 sq ft (up to 2 ADUs per lot) 32 ft (varies by lot width) 5 ft / 5 ft $385 to $630 17 weeks $11,638 to $13,022 $2,015 / mo
Bellevue 1,200 sq ft 24 ft 5 ft / 20 ft (or alley) $385 to $547 8 weeks $3,000 to $11,000 $2,664 / mo
Tacoma 1,000 sq ft 24 ft (per HB 1337 floor) 5 ft / 5 ft $196 to $490 8 weeks $3,000 to $11,000 $1,496 / mo
Vancouver 1,000 sq ft 24 to 35 ft 5 ft / 5 ft (0 ft on alley) $200 to $420 8 weeks $14,940 to $25,981 $1,484 / mo
Spokane 1,000 sq ft 25 ft 5 ft / 5 ft $210 to $315 8 weeks $3,000 to $11,000 $1,161 / mo
Kirkland 1,200 sq ft 25 ft 5 ft / 10 ft $350 to $560 8 weeks $3,000 to $11,000 $2,228 / mo
Redmond 1,000 sq ft 25 ft 5 ft / 5 ft $245 to $416 8 weeks $30,194 to $33,749 $2,274 / mo
Sammamish 1,200 sq ft 24 ft 5 ft / 5 ft $178 to $356 8 weeks $3,000 to $8,000 $1,800 / mo
Edmonds 1,200 sq ft 24 ft 5 ft / 10 ft $210 to $490 8 weeks $11,382 to $21,636 $1,693 / mo
Olympia 1,000 sq ft 24 ft 5 ft / 5 ft $210 to $540 8 weeks $3,000 to $11,000 $1,527 / mo

3. City Highlights: Seattle, Eastside (Bellevue/Kirkland), Tacoma & Vancouver

Seattle: Two ADUs Per Lot and Rear Yard Coverage Rules

Seattle reformed its ADU code ahead of the state in 2019 and expanded it further under HB 1337 and the 2025/2026 One Seattle Plan.

  • Size and Exclusions: Detached ADUs (DADUs) in Seattle can reach 1,000 square feet of gross floor area, and up to 250 square feet of attached garage or storage space, plus basement mechanical areas and exterior bike storage, do not count against that 1,000-square-foot cap.
  • Parking: Zero off-street parking spaces are required for ADUs or DADUs anywhere in Seattle.
  • Sewer Side-Sewer Rules: King County and Seattle Public Utilities (SPU) allow an ADU to tie into your existing 6-inch side sewer on your property (provided a video camera inspection confirms the pipe is intact), saving $15,000 to $35,000 compared to trenching into the main city street.

The Eastside: Bellevue, Kirkland, Redmond, and Sammamish

Historically, Eastside suburbs allowed attached mother-in-law suites inside the main house but restricted detached backyard cottages. Under HB 1337 and updated local codes:

  • Bellevue, Kirkland, and Sammamish now allow detached ADUs up to 1,200 square feet submitted online through the shared regional MyBuildingPermit.com portal.
  • Critical Areas and Tree Retention: On the Eastside, the primary site constraint is Critical Areas Ordinances (steep slopes over 15% to 40%, wetlands, stream buffers) and tree retention credits. Confirming your lot's critical area map before designing the footprint avoids months of geotechnical review.
  • Parking Near Transit: Under RCW 36.70A.681(2), no Eastside city can require off-street parking for an ADU located within 0.5 miles walking distance of a major transit stop (such as Sound Transit East Link Light Rail stations or Stride BRT stops), or on any lot smaller than 6,000 square feet.

Tacoma, Vancouver, and Spokane

  • Tacoma: Under Tacoma's "Home In Tacoma" zoning updates and HB 1337, detached ADUs up to 1,000 sq ft are permitted by-right with zero rear setback along alleys.
  • Vancouver: Clark County's largest city waives certain Park and Transportation System Development Charges (SDCs) for qualifying infill ADUs and allows zero-lot-line alley cottages.
  • Spokane: Following its Building Opportunity and Choices for All (BOCA) reform, Spokane permits detached and attached ADUs up to 1,000 sq ft with 5-foot side and rear setbacks and some of the lowest construction costs in the state ($210 to $315/sq ft).

4. Washington ADU Construction Costs & WSEC Energy Code Requirements

Why does an ADU in Puget Sound cost more per square foot than one in Texas or Florida? Three technical factors drive Washington residential construction budgets:

  1. Washington State Energy Code (WSEC-R): Washington enforces one of the strictest residential energy codes in North America (Climate Zone 4C west of the Cascades and Climate Zone 5B in Eastern Washington). New detached ADUs must use high-efficiency electric heat pumps for space heating and domestic hot water, heat recovery ventilators (HRVs) or energy recovery ventilators (ERVs) for fresh air, high-performance triple-pane or low-U-factor windows, and continuous insulation or 2x6 advanced framing to earn the required WSEC energy efficiency credits.
  2. Seismic Design Category D: Western Washington sits in high-seismic zones requiring engineered shear walls, hold-down anchors, and deeper frost-depth foundations.
  3. Stormwater Management (On-Site Infiltration): In Puget Sound cities, adding 600 to 1,000 square feet of new roof area triggers Department of Ecology stormwater drainage rules, often requiring a drywell, rain garden, or dispersion trench on your lot.

You can estimate your exact city's budget with our ADU cost calculator, or use the 2026 Washington benchmark table below:

ADU Project Type Puget Sound Cost (Seattle / Bellevue / Kirkland) South Sound & SW WA (Tacoma / Olympia / Vancouver) Eastern WA (Spokane / Tri-Cities / Wenatchee)
Basement / Garage Conversion (450 to 650 sq ft) $135,000 to $195,000 $105,000 to $150,000 $90,000 to $130,000
Detached 1-BR DADU (600 to 750 sq ft) $235,000 to $340,000 $160,000 to $245,000 $135,000 to $195,000
Detached 2-BR Two-Story DADU (850 to 1,000 sq ft) $325,000 to $460,000 $215,000 to $330,000 $180,000 to $265,000

5. Selling Your ADU as a Condo vs. Long-Term Rental Income

Washington is one of the few states where homeowners have two high-value exit strategies for a backyard cottage:

  • Strategy 1: Long-Term Rental Cash Flow: In Bellevue and Redmond, a 1-bedroom ADU rents for a median $2,274 to $2,664/month, and a 2-bedroom unit commands $2,845 to $3,295/month. In Seattle, 1-bedroom DADUs rent for a median $2,015/month ($2,804/month for 2 bedrooms).
  • Strategy 2: Condominium Split and Sale (RCW 36.70A.681(1)(j)): Because HB 1337 prohibits cities from barring the condominiumization of ADUs, homeowners in Seattle, Bellevue, Kirkland, and Tacoma can record a two-unit or three-unit condominium declaration under the Washington Uniform Common Interest Ownership Act (WUCIOA) and sell the backyard DADU to an individual homebuyer for $550,000 to $900,000+, paying off their primary mortgage while keeping their main house.

How the Backyard Wealth Package Works in Washington

Navigating WSEC-R energy credits, King County sewer capacity charges, and municipal portals (cosaccela.seattle.gov or MyBuildingPermit.com) takes specialized permit coordination. Build With A Plan handles the entire pre-construction phase through The Backyard Wealth Package:

"We turn your backyard into a rental unit. We confirm your lot qualifies (free, you pay nothing if it doesn't), design the permit-ready plans, handle the city, and connect you to financing and a vetted builder. $6,000 flat, about what an architect charges just to start."

And every homeowner is backed by our written deliverables commitment:

"Your construction documents will be permit-ready and accepted for submission by your city, or we revise them free until they are. And if your property doesn't pass our free feasibility check, you pay nothing."

We won't even take your money unless your property qualifies. Learn more about how it works or read whether you need an architect for an ADU.

Washington HB 1337 Lot Check

Check Your Washington Property's ADU & DADU Eligibility

Verify your lot's exact size allowance (1,000 to 1,200 sq ft), setbacks, critical area overlays, and construction budget for free. We won't even take your money unless your property qualifies.

Run Your Free Feasibility Check

6. Frequently Asked Questions

Can I really build two ADUs on my single-family lot in Washington?

Yes. Under RCW 36.70A.681(1)(c), all cities and counties planning under the Growth Management Act must allow at least two ADUs on every lot located inside an Urban Growth Area that meets the minimum lot size for a single-family home. You can configure them as one attached unit plus one detached cottage, two detached cottages, or conversions of existing structures such as garages.

Does Washington HB 1337 override HOA bans on ADUs?

For new homeowners associations and common interest communities created after July 23, 2023, state law (RCW 64.38.058 / RCW 64.90.585) prohibits covenants that ban ADUs. However, older pre-existing HOAs with recorded CC&Rs adopted before July 2023 may still enforce private architectural restrictions unless amended by the association.

What is the King County Sewer Capacity Charge for an ADU?

If your property is in the King County Wastewater Treatment service area (which covers Seattle, Bellevue, Kirkland, Redmond, Renton, Shoreline, and surrounding cities), adding a new detached ADU triggers a quarterly King County Sewer Capacity Charge billed over 15 years (or payable upfront at a discount), assessed at a reduced accessory-dwelling rate (0.6 Residential Customer Equivalents) rather than the full single-family rate.

Do I have to provide a parking space for a Washington ADU?

Under HB 1337, cities cannot require off-street parking for an ADU if your lot is smaller than 6,000 square feet, or if your property is within 0.5 miles walking distance of a major transit stop. In Seattle, zero parking is required citywide regardless of lot size. On larger suburban lots over 6,000 sq ft outside transit buffers, a city can require at most one parking space (or two on lots over 6,000 sq ft if not near transit, depending on local code).

washington adu hb 1337 seattle dadu bellevue adu tacoma adu

Stop Researching. Start Building.

Get your permit-ready drawings in 10 business days. 14-day money-back guarantee.

Get My Drawings →