Professional Floor Plan Drafting
for Greeley, CO Homes

As-built drawings, permit-ready floor plans, and renovation layouts for Greeley homeowners, investors, and contractors. Accurate CAD drawings in 10 business days, starting at $997.

Get Your Floor Plans → Floor Plan FAQ ↓

14-day money-back guarantee · 10 business day turnaround

Common Uses in Greeley

📋
Permit Applications
🏡
Home Listings & Resale
🔧
Renovation Planning
🏦
Refinancing & Loans
📐
As-Built Documentation
🏢
HOA Submissions

What Greeley Homeowners Need to Know Before Submitting

Size & Zoning Rules

Accurate floor plans are the foundation of any ADU, garage conversion, or addition permit in Greeley — Community Development will not accept a permit application without them. Greeley's current ADU size cap is 1,200 sq ft — generous enough to accommodate most project types.

Greeley does not impose an owner-occupancy requirement, so you can rent both the main home and any ADU or conversion as investment units.

Homeowners in Greeley who document and legitimize their square footage correctly are positioning a home in a rental market where 1-bedroom units average approximately $999/month.

Permit Process & Fees

Community Development permit fees for this project type typically range from $13,924 to $16,612 depending on project valuation and scope. Plan check runs approximately 6 weeks — though each correction cycle adds 3–6 weeks, which is why code-compliant drawings matter so much.

Floor plans submitted to Community Development as part of a permit application must include a site plan, floor plans, all four elevations, an electrical plan, and energy compliance documentation — plus if structural changes are involved, a licensed engineer must stamp the structural drawings.

Visit Community Development ↗

Construction Cost Context

Greeley's adu / renovation construction costs run $140–$210 per square foot — a moderate range driven by labor markets, local code complexity, and finish level. Our drawings are priced at a fraction of what a full-service architect would charge to produce the same permit set.

⚠ Common Pitfall in Greeley

Greeley's Community Development department requires a separate sewer tap fee study for most ADUs, since the city's aging clay pipe infrastructure in older neighborhoods like the Jefferson or Glenmere districts sometimes can't handle added capacity without a line assessment — this can add several weeks before your permit even gets scheduled for review. Weld County also layers on its own septic or well verification if your lot predates certain municipal water annexations, which catches a lot of homeowners off guard mid-process. Because Greeley allows short-term rentals, you'll also need to budget time for a separate STR license application through the city after your certificate of occupancy, since that approval doesn't move in parallel with your building permit.

Expert Verdict — Marcus Reid, Licensed Designer

"In my experience with Greeley homeowners, that 6-week plan check figure is optimistic — it's really a state-level estimate, and incomplete drawing sets (which is most first submittals) will push you closer to 10-12 weeks in practice, so call Community Development directly before locking in a start date. The $200/sqft cost is also a broad estimate rather than a Greeley-specific number, so I'd get at least two local contractor quotes before you build your budget around it."

Market Context

Greeley has a median home value of $330,000. Comparable renovation projects in this market typically add 23% to resale value.

Neighborhoods in Greeley with the strongest renovation and resale value potential include Glenmere / Cranford, Arlington Park, Alta Vista, Downtown Greeley, Kelly Farm. Close to the University of Northern Colorado with many older single‑family homes and sizable yards ideal for ADUs.

Permit Process

Permit applications are reviewed by the Community Development, with a plan check timeline of approximately 6 weeks. Permit fees in Greeley range from $13,924 to $16,612 depending on project scope. Design review: Yes - in historic districts only.

Greeley falls within Seismic Design Category Seismic Design Category B, which affects structural requirements for any new addition tying into the existing structure.

Local Floor Plan Lenders in Greeley

These lenders offer HELOC and renovation financing that often requires accurate as-built drawings in Weld County. Compare terms before committing.

Elevations Credit Union
HELOC

Home equity loans and HELOCs in Colorado (HELOC rates shown as low as 6.99% variable; construction loan options also available; in-house Colorado underwriting; funds often available in 2–4 weeks).

Visit Lender ↗
Weld Community Credit Union
Renovation loan

Local Greeley credit union (branch at 2555 47th Avenue); offers fixed-rate home equity loans/second mortgages for renovations with competitive rates and no prepayment penalties.

Visit Lender ↗
First Bank (First Bank & Trust / First Bank)
Construction loan

Offers construction-to-permanent single-close loans and residential construction financing — local/regional construction lending with construction and renovation mortgage options.

Visit Lender ↗
Bank of Colorado
Construction loan

Single-close construction loan and construction financing with local decision-making; offers ARM fixed-period options (5/1, 7/1, 10/1) and construction-to-perm features.

Visit Lender ↗
RenoFi (specialty ADU/renovation financing platform)
HELOC

ADU-focused financing model that uses after-renovation value to expand borrowing power (advertises up to ~11x increase in borrowing power vs. conventional home equity); partners with lenders to provide HELOC and renovation loan products in Colorado.

Visit Lender ↗

Build With A Plan is not affiliated with these lenders. Always compare rates and consult a mortgage professional.

Vetted Local Contractors in Greeley

Need a contractor once your drawings are ready? These are vetted local options. Independent — no referral fees paid or received.

Resolutions Contractors
All
(307) 640-1497
View Contractor ↗
All Trades LLC
Garage conversion
(970) 812-3838
View Contractor ↗
TK Home Improvements / TK Improvements
All
(303) 505-0563
View Contractor ↗
D&G Construction (DGHOMEPRO)
All
View Contractor ↗
Mark Hammer Construction LTD.
All
View Contractor ↗

Build With A Plan provides drawings only. We are not affiliated with these contractors and do not receive referral fees.

What's Included in Your Greeley Floor Plan Package

📐
Measured Floor Plans
All levels drawn to scale with room dimensions, wall thickness, door/window locations, and square footage
🚪
Door & Window Schedule
Complete schedule of all openings with sizes, types, and hardware notations per code
📏
Verified Square Footage
Gross living area calculated per ANSI standards — defensible for appraisals and listings
Electrical Layout (Standard+)
Existing outlet, switch, panel, and fixture locations documented for renovation planning
📁
PDF + DWG Files
Print-ready PDFs for permit submittal and editable DWG/DXF for contractors and engineers
🏷️
Title Block & Notations
Formatted to Greeley building department standards with required code references

Greeley Floor Plan Packages

One-time fee. No retainer. No hourly billing.

Starter
$997
one-time, no retainer
  • As-built floor plans (all levels)
  • Verified square footage
  • Door & window schedule
  • Room labels and dimensions
  • PDF + DWG delivery
  • 10 business day turnaround
Get Started →
Most Popular
Standard
$1,497
one-time, no retainer
  • Everything in Starter
  • Electrical layout documentation
  • Plumbing fixture locations
  • Site plan with setbacks
  • Code notations for permit submittal
  • 1 round of revisions
Get Started →
Best Value
Premium
$1,997
one-time, no retainer
  • Everything in Standard
  • Proposed renovation overlay
  • 3D massing model
  • HOA submission package
  • Title 24 energy compliance
  • 2 rounds of revisions
  • Priority 5-day turnaround
Get Started →

Your Floor Plans in 3 Steps

01

Share Your Home Details

Provide your property address, room measurements, and photos. We'll confirm your order and assign a drafting coordinator within 4 business hours.

02

We Draft Your Plans

Our CAD team converts your measurements into precise, scaled floor plans — formatted for Greeley's building department and CO code standards. Delivered in 10 business days.

03

Download and Use

Receive your drawings in PDF and DWG format — ready for permit submittal, contractor bidding, listing agents, appraisers, or HOA submission.

Greeley Floor Plan Drafting FAQs

When do I need professionally drafted floor plans in Greeley? +

You need accurate floor plans for: permit applications (required by Greeley's building department for any structural work), refinancing or home equity loans, selling your home (accurate square footage documentation), renovation contractor bidding, HOA design review submissions, and insurance claims. Our as-built drawings capture your home's exact current dimensions.

What is an as-built floor plan and why do I need one in Greeley? +

An as-built floor plan documents your home as it currently exists — including all room dimensions, door and window locations, wall thicknesses, and square footage. These are required when the original permit drawings are unavailable or the home was modified without permits. Greeley's building department requires accurate as-builts when you apply for renovation or addition permits on older homes.

How much does floor plan drafting cost in Greeley? +

Our floor plan drafting packages for Greeley start at $997 for a standard residential home. This includes measured floor plans for all levels, room labels, door and window schedules, and verified square footage. Local drafting services typically charge $1,500–$4,000 for the same work. We deliver within 10 business days with a 14-day money-back guarantee.

How do you create floor plans remotely for my Greeley home? +

You provide basic measurements (room dimensions, door/window sizes) and photos of each room. Our drafting team converts these into accurate CAD drawings with precise dimensions, wall thicknesses, and notations. For permit-grade as-built drawings, we may request additional measurements or a site visit from a local partner. We serve all Greeley neighborhoods remotely.

What format are the floor plan drawings delivered in? +

We deliver drawings in PDF (for printing and permit submission) and DWG/DXF (AutoCAD-compatible format for contractors, engineers, and architects to work from). All drawings are formatted to Greeley building department standards and include title block, scale, and code notations required for permit submission.

Can you draft floor plans for a rental property or multi-unit building in Greeley? +

Yes — we draft floor plans for single-family homes, duplexes, triplexes, ADUs, condos, and small commercial properties in Greeley. Multi-unit buildings are priced based on the total number of units and floors. Contact us for a custom quote if your property has more than 4 units.

Will accurate floor plans increase my home's value in Greeley? +

In Greeley, where median home values are around $330,000, inaccurate or missing square footage records can suppress list price and appraisal value. Professional as-built drawings establish defensible square footage for appraisers and buyers. Unpermitted additions documented and legitimized through permit drawings can recover thousands in appraised value.

Do I need floor plans to get an ADU or addition permit in Greeley? +

Yes — Greeley's building department requires accurate floor plans as part of any ADU, garage conversion, or addition permit application. Our packages combine floor plan drafting with the full permit-ready drawing set (site plan, elevations, electrical, Title 24) needed for plan check submittal. If you only need the floor plans themselves, our Starter package covers that.

Can you draft floor plans from old blueprints or photos in Greeley? +

Yes — we can redraft from original blueprints, scans of old permit sets, hand-drawn sketches, or room photos combined with your measurements. We regularize old drawings to current CAD standards and update them to reflect any modifications made since original construction. This is a common service for Greeley homes built before the 1990s.

Nearby Cities

Windsor Erie Evans Denver

Also Available in Greeley

Planning to build an ADU? See our ADU design service.

View ADU Design →

Ready to Move Forward With Your Greeley ADU?

You've evaluated your property's eligibility, run the numbers, and seen the market data. The next step is getting permit-ready architectural drawings to submit to Community Development.

🏛️

Hire a Local Architect

$3,000 – $8,000

  • ·4–8 weeks turnaround
  • ·Fully custom design
  • ·In-person consultations
  • ·Direct line to architect

Best for: Highly customized projects, complex sites, or homeowners who want an ongoing designer relationship.

Practical Choice
📐

Build With A Plan

$997 – $2,997

  • 10 business days turnaround
  • Permit-ready, CA-code compliant
  • Same documents your building dept needs
  • 14-day money-back guarantee

Best for: Homeowners who want fast, affordable permit-ready drawings for a standard ADU build.

Both options produce permit-ready architectural drawings accepted by Community Development. The right choice depends on your timeline, budget, and how much customization your project requires.

See Our Drawing Packages ↓ Common Questions ↓