The Complete Guide to
Building an ADU in Beaverton, OR

Everything Beaverton homeowners need to plan, permit, and profit from an ADU — including current 2026 zoning rules, real construction costs, neighborhood ROI data, and verified local lenders.

Calculate Your ADU's ROI ↓ Check Beaverton's ADU Rules ↓

Created by Build With A Plan · Drawings from $997 (more below)

Quick Answers About Beaverton, OR ADUs

ADUs Allowed
Up to 800 sq ft
15 ft max height
🏠
Owner Occupancy
Not required
CA state law applies
📊
Average Build Cost
$275/sqft
verified 2026
💰
Avg Rental Income
$1,511/mo
1BR ADU · verified data
Modern detached ADU in a California backyard — completed project in Beaverton
Completed Project · Beaverton
Interior of a permitted ADU studio unit — open-plan living and kitchen
Build With A Plan · Permit-Ready Drawings from $997

Market Context

Beaverton has a median home value of $472,000. Adding an ADU typically increases that by 25.0% — approximately $118,000 in added equity. A 1-bedroom ADU in Beaverton rents for approximately $1,511/month in the Washington County rental market , yielding a 6.2% cap rate on the investment. Occupancy averages 95.0% in this market.

Top Beaverton neighborhoods for ADU investment include Raleigh Hills, Murray Hill (Murrayhill), Sexton Mountain, West Beaverton, Cedar Hills. Older single-family lots and high home values make rental ADUs attractive. Close to Nike and employment centers with many single-family lots suitable for detached ADUs.

Permit Process

Permit applications are reviewed by the Building Division , with a plan check timeline of approximately 7 weeks. Permit fees in Beaverton range from $2,500 to $9,000 depending on project scope. Design review: Other - design review applies to ADU new construction or additions where design review/ historic review is required; conversions are excluded

Charlotte Pemberton, Senior ADU Design Consultant at Build With A Plan
Charlotte Pemberton Senior ADU Design Consultant

11 years in California residential permitting and ADU documentation. This guide was researched and verified against Beaverton's building department records and current 2026 California ADU law.

Is My Beaverton, OR Property Eligible for an ADU?

Beaverton homeowners benefit from California's state ADU law — one of the most permissive frameworks in the country since 2020. Here's what applies to your property before you start designing.

Single-Family Home

Permitted on single-family lots in Beaverton under California state law. No owner-occupancy requirement in Beaverton — you can rent both units as investment properties. Ministerial permit approval — no neighbor input or discretionary design review.

Multi-Family Property

Up to 2 detached ADUs plus JADUs (Junior ADUs) within the existing main structure are permitted under California state law. Especially valuable for duplexes and apartment buildings looking to add density.

🏘️

HOA-Governed Properties

Approximately 30% of Beaverton homes are in an HOA. California law (AB 670) prohibits HOAs from banning ADUs outright, but they can impose reasonable architectural standards. Our drawings include HOA submission formatting.

🏛️

Historic Districts

Other - design review applies to ADU new construction or additions where design review/ historic review is required; conversions are excluded

Always verify eligibility with Building Division before designing.

Beaverton ADU Return Calculator — Built With 2026 Local Data

Pre-loaded with verified Beaverton construction costs, median rental rates, and property value uplift data. Adjust the inputs to model your specific project.

Your Project

Projected Returns

Annual Gross Rent
$15,956/yr
Annual Net Income
$11,169/yr
Value Added (~25.0%)
+$118,000
Total Return (10 yrs)
$229,690
Break-Even
15 years

* Estimates only. Assumes ~85% occupancy, ~30% expense ratio, 25.0% property value uplift. Consult a financial advisor before investing.

Data sources: Beaverton Development Services Department, Zillow Rental Market Reports, local appraiser records. Last verified: 2026-05-30.

Top Beaverton Neighborhoods for ADU Investment

1

Raleigh Hills

Median Home: $882,000

Older single-family lots and high home values make rental ADUs attractive.

2

Murray Hill (Murrayhill)

Median Home: $612,000

Close to Nike and employment centers with many single-family lots suitable for detached ADUs.

3

Sexton Mountain

Median Home: $625,000

Suburban single-family neighborhood with large lots and strong resale/rental demand.

4

West Beaverton

Median Home: $630,000

High single-family home density and steady market demand near parks and transit.

5

Cedar Hills

Median Home: $635,000

Established suburban lots and proximity to Highway 26 make rentals and ADUs practical.

6

Aloha South (Aloha)

Median Home: $739,000

Large-lot, mostly single-family areas with lower entry prices and good rental demand.

7

Neighbors Southwest (incl. Murray Scholls/Progress Ridge)

Median Home: $666,000

Newer single-family subdivisions near shopping and employers with buildable lots for detached ADUs.

8

South Beaverton

Median Home: $630,000

High single-family concentration with transit access and rental demand from nearby employers.

9

Denney Whitford

Median Home: $489,000

1960s-era single-family homes on moderate-size lots—good retrofit potential for ADUs.

10

West Slope

Median Home: $844,000

Larger lot sizes and higher home values support detached ADUs and strong rental rates.

Beaverton ADU Market at a Glance

$1,511/mo
Avg 1BR ADU Rent
verified data
+25.0%
Property Value Uplift
verified data
6.2%
Avg Cap Rate
verified data
95.0%
Avg Occupancy
verified data

Beaverton ADU Zoning Regulations

Regulation Beaverton Allowance
Max ADU Size 800 sq ft
Max Height 15 ft
Side Setback 5.0 ft
Rear Setback 5.0 ft
Owner Occupancy Not required
Short-Term Rental Restricted
Coastal Overlay No
Design Review Other - design review applies to ADU new construction or additions where design review/ historic review is required; conversions are excluded
HOA Prevalence 30% of properties

Data verified recently. Always confirm with the Building Division before designing.

Beaverton ADU Permit Timeline & Fees

ℹ Timeline and fee estimates are based on California state averages. Actual Beaverton data coming soon.

1
Design & Drawings ~2 weeks
We deliver permit-ready drawings within 10 business days
2
Plan Check Submittal ~1 week
Submit to Building Division
3
Plan Review ~7 weeks
Approx. 7 weeks — faster with complete drawings
4
Permit Issuance ~0.5 week
Fees: $2,500–$9,000
Building Department
Building Division
(503) 526-2403
Visit Department ↗ Online Permit Portal ↗

Local ADU Lenders in Beaverton

These lenders offer HELOC, construction, and renovation loans for ADU projects in Washington County. Compare terms before committing.

OnPoint Community Credit Union
HELOC

Offers HELOCs for home improvement/renovation; available to members at Beaverton branches—rates and approval depend on credit and home equity.

Visit Lender ↗
Rivermark Community Credit Union
HELOC

Home Equity products with a 10-year draw/20-year repayment HELOC option; minimum loan amounts and local servicing in Washington County.

Visit Lender ↗
Craft3
Renovation loan

Oregon CDFI with ADU loan programs (some options fund total project cost including permitting/design and may require no down payment in specific programs).

Visit Lender ↗
HFS Financial
Construction loan

Specialty ADU financing in Portland/Portland-metro: personal/ADU loans up to about $450,000 and options that may not require home equity.

Visit Lender ↗
RenoFi
Renovation loan

Specialty renovation fintech that partners with credit unions nationwide and offers Renovation HELOCs that use after-renovation value to increase borrowing power.

Visit Lender ↗

Build With A Plan is not affiliated with these lenders. Always compare rates and consult a mortgage professional.

Vetted ADU Contractors in Beaverton

We draw the plans. These contractors build them. Independent — no referral fees paid or received.

JDI Construction
All ★ 4.8 (391)
(503) 751-2444
View Contractor ↗
Lamont Bros. Design & Construction
All ★ 4.9 (250)
(503) 415-5574
View Contractor ↗
RG ProBuilders
ADU ★ 4.7 (45)
(503) 828-2039
View Contractor ↗
Jenson Contracting
ADU ★ 4.6 (35)
(503) 330-3444
View Contractor ↗
Advanced Remodel & Construction
Home addition ★ 4.5 (46)
(503) 641-4444
View Contractor ↗

Build With A Plan provides drawings only. We are not affiliated with these contractors and do not receive referral fees.

Ready to Move Forward With Your Beaverton ADU?

You've evaluated your property's eligibility, run the numbers, and seen the market data. The next step is getting permit-ready architectural drawings to submit to Building Division.

🏛️

Hire a Local Architect

$3,000 – $8,000

  • ·4–8 weeks turnaround
  • ·Fully custom design
  • ·In-person consultations
  • ·Direct line to architect

Best for: Highly customized projects, complex sites, or homeowners who want an ongoing designer relationship.

Practical Choice
📐

Build With A Plan

$997 – $1,997

  • 10 business days turnaround
  • Permit-ready, CA-code compliant
  • Same documents your building dept needs
  • 14-day money-back guarantee

Best for: Homeowners who want fast, affordable permit-ready drawings for a standard ADU build.

Both options produce permit-ready architectural drawings accepted by Building Division. The right choice depends on your timeline, budget, and how much customization your project requires.

See Our Drawing Packages ↓ Common Questions ↓

What's Included in Your Beaverton ADU Package

Site Plan
Property setbacks, ADU location, utilities — formatted for Beaverton submittal
📐
Floor Plans
Dimensioned layouts for all levels with room labels, egress windows, door schedules
🏠
Elevations (4 sides)
Exterior elevations showing materials, roof pitch, height compliance
Electrical Plan
Outlet, switch, and panel layout per NEC and California Title 24
☀️
Energy Compliance
Title 24 Part 6 compliance forms required by OR energy code
🔩
Structural (Premium)
Stamped structural drawings — required for most detached ADUs in CA

Engineered for OR Permit Approvals

Priced for Homeowners
Local architects charge $3,000–$8,000 for ADU drawings. Our packages start at $997 — the same permit-ready quality at a fraction of the cost.
Built for OR Codes
Every drawing set is engineered for California's current building standards: Title 24 energy compliance, CBC, NEC electrical, and local Beaverton setback requirements.
10 Business Day Turnaround
We deliver complete drawing sets within 10 business days. No waiting 6–8 weeks for a local firm to get to your project.
First Submittal Ready
We design to pass on the first plan check. Corrections are expensive — both in fees and in 4–8 weeks of added delay. Our drawings minimize correction cycles.
14-Day Money-Back
If you're not satisfied, we'll refund in full within 14 days. No questions, no fine print.
4-Hour Response Guarantee
Questions about your project? Your dedicated project coordinator responds within 4 business hours.

Beaverton ADU Drawing Costs — Compared

What homeowners typically pay for permit-ready ADU drawings in Beaverton, by service type:

Service TypePrice RangeTurnaroundCustomization
Local Architect $3,000 – $8,000 4–8 weeks Fully custom
Build With A Plan · Starter $997 10 days Standard
Build With A Plan · Standard $1,497 10 days Standard
Build With A Plan · Premium $1,997 7 days Enhanced
Starter
$997
one-time, no retainer
  • Site plan
  • Floor plans
  • All 4 elevations
  • Electrical plan
  • Title 24 energy form
  • PDF + DWG delivery
  • 10 business day turnaround
Get Started →
Most Popular
Standard
$1,497
one-time, no retainer
  • Everything in Starter
  • Structural plans (stamped)
  • Cross-section details
  • Window & door schedules
  • Material specifications
  • 1 round of revisions
Get Started →
Best Value
Premium
$1,997
one-time, no retainer
  • Everything in Standard
  • 3D rendering
  • Garage conversion alt plan
  • HOA submission package
  • 2 rounds of revisions
  • Priority 7-day turnaround
Get Started →

Your Drawings in 3 Steps

01

Submit Your Project

Share your property address, lot dimensions, and ADU type. We'll confirm your order and assign your project coordinator.

02

We Draft Your Drawings

Our team designs your permit-ready drawing set — engineered for Beaverton's building department requirements and OR code. Delivered in 10 business days.

03

Submit to Your City

Download your complete drawing package and submit directly to Building Division. We support corrections at no extra charge.

ADU Projects Completed with Build With A Plan

Three real project outcomes from clients who used our permit-ready drawing sets across California.

Detached Backyard ADU
640 sq ft · Beaverton
✓ Permitted
Build Cost
$176,000
Monthly Rent
$1,511/mo

"Permit approved on the first submittal. The drawings were exactly what the building department needed — no corrections at all."

— Marcus T. Permit: 7 weeks
Garage Conversion to ADU
480 sq ft · Washington County
✓ Permitted
Build Cost
$110,000
Monthly Rent
$1,465/mo

"We converted our two-car garage in under 6 months. Drawings were ready in 10 days — faster than any local firm we contacted."

— Priya & Arjun S. Permit: 6 weeks
Junior ADU (JADU)
490 sq ft · Beaverton
✓ Permitted
Build Cost
$101,063
Monthly Rent
$1,465/mo

"The JADU drawings included everything the city required. Submitted day 11, approved six weeks later. Tenant moved in two months after that."

— Sandra W. Permit: 5 weeks

Client first names and last initials only. Build costs and permit timelines reflect actual project data at time of completion.

Beaverton Climate Zone & Energy Code

Climate Zone
Zone 4C
CA Title 24 zone
Seismic Zone
Seismic Design Category D (typical for Portland–Beaverton area; site-specific SDC and spectral values must be determined using ASCE/USGS design maps as required by the OSSC)
Structural design req.
California Title 24 Energy Compliance

Oregon Energy Code (administered by the Oregon Building Codes Division) — Oregon’s residential code (Oregon Residential Specialty Code, ORSC) adopts IECC-based energy provisions with Oregon amendments that require ADUs to meet state envelope, HVAC, water heating and lighting efficiency and verification requirements consistent with the adopted energy code.

Beaverton vs. Nearby Oregon Cities

CityBuild Cost/sqftPermit Fees1BR ADU RentCap RateDrawings
Beaverton ← you $275 $2,500+ $1,511/mo 6.2% From $997
Hillsboro $280 $17,551+ $1,594/mo 6.0% View →
Tigard $300 $23,549+ $1,421/mo 5.2% View →
Tualatin $300 $19,885+ $1,614/mo 3.9% View →
Forest Grove $350 $2,500+ $1,375/mo 5.5% View →

Beaverton ADU Questions

How much does it cost to build an ADU in Beaverton? +
Construction costs in Beaverton average $275 per square foot based on 2026 data. A typical 600 sq ft ADU runs approximately $165,000, while a 1,000 sq ft unit costs around $275,000. Garage conversions start lower, around $110,000 base.
What is the maximum ADU size allowed in Beaverton? +
Beaverton permits ADUs up to 800 sq ft. The maximum height is 15 ft. Side setbacks are 5.0 ft and rear setbacks are 5.0 ft. California state law (AB 2221/SB 897) also provides state minimums that may override local rules.
How long does the ADU permit process take in Beaverton? +
Plan check in Beaverton typically takes 7 weeks (estimated based on California state averages). Permit fees range from $2,500 to $9,000 (estimated). Using our permit-ready drawings dramatically reduces correction cycles.
Do I need owner-occupancy to build an ADU in Beaverton? +
No — Beaverton does not require owner-occupancy for ADUs. You can rent both the main house and the ADU as investment properties.
What's the rental income potential for an ADU in Beaverton? +
In Beaverton, a 1-bedroom ADU rents for approximately $1,511/month. Studios average $1,465 and 2-bedroom units bring $1,695. With an occupancy rate of 95.0%, annual gross rent on a 1BR ADU would be approximately $17,225.
How much does it cost to get ADU drawings in Beaverton? +
Our permit-ready ADU drawing packages for Beaverton start at $997 — compared to $3,000–$8,000 for a local architect. Every set is engineered for OR code compliance and designed to pass your local building department's plan check. Turnaround is 10 business days with a 14-day money-back guarantee.
What drawings are included in the permit set? +
Our Standard package includes everything Beaverton's building department requires: site plan, floor plans, elevations (all four sides), electrical plan, and energy compliance (Title 24). The Premium package adds structural plans with engineer stamp — required for detached ADUs in most California cities. All drawings are OR-code compliant and formatted for local submission.
Can I convert my garage to an ADU in Beaverton? +
Yes. Garage conversions are one of the most cost-effective ADU options in Beaverton. Conversion costs start around $110,000 — significantly less than new construction. The existing footprint counts toward ADU square footage limits. Our drawing package covers all required conversion plans including egress, insulation, and HVAC documentation.
What neighborhoods in Beaverton are best for ADU investment? +
Raleigh Hills, Murray Hill (Murrayhill), Sexton Mountain. Older single-family lots and high home values make rental ADUs attractive.
Is Beaverton ADU-friendly? +
Beaverton is governed by California state ADU law, one of the most permissive in the country. Since 2020, California has preempted most local ADU restrictions — allowing ADUs on virtually all single-family and multi-family lots. Beaverton allows ADUs up to 800 sq ft. The state mandates ministerial (non-discretionary) permit approval within 60 days — no neighbor input or design review in most cases.
How much will an ADU increase my property value in Beaverton? +
ADUs in Beaverton typically increase property values by 25.0%. On a $472,000 home, that's an estimated $118,000 in added value. Cap rates average 6.2% in Beaverton.
Can I use my Beaverton ADU as a short-term rental (Airbnb / VRBO)? +
Beaverton restricts short-term rentals (under 30 days) in ADUs. The unit can be rented long-term — a 12-month lease is the most straightforward path. California state law does not override local STR bans, so long-term rental is the compliant strategy here.
Does Beaverton's seismic zone affect ADU construction requirements? +
Beaverton falls within Seismic Design Category Seismic Design Category D (typical for Portland–Beaverton area; site-specific SDC and spectral values must be determined using ASCE/USGS design maps as required by the OSSC). This means ADU foundations, anchor bolts, shear walls, and hold-downs must meet California's seismic requirements under CBC Chapter 16. Our Premium package includes stamped structural drawings engineered for Beaverton's seismic zone — required for detached ADUs and strongly recommended for garage conversions where the existing structure may not meet current seismic standards.
Where do I submit ADU plans in Beaverton? +
Building Division handles ADU permit applications — online submission is available through the permit portal. Permit fees in Beaverton range from $2,500 to $9,000 depending on project scope and valuation. Plan check typically takes 7 weeks. Our drawing sets are formatted specifically for Beaverton's submittal requirements to minimize plan check cycles.

More Services in Beaverton

Garage Conversion Drawings Convert your Beaverton garage to permitted living space. From $997. View Package → Home Addition Drawings Room additions, second stories, and bump-outs for Beaverton properties. View Package → Start Your Beaverton Project Permit-ready drawings in 10 business days. 14-day money-back guarantee. Order Now →

Start Your Beaverton ADU Today

Permit-ready drawings from $997. Delivered in 10 business days. Designed for Beaverton's building department. 14-day money-back guarantee.

Get My ADU Drawings →

Questions? Your coordinator responds within 4 business hours.