Riverside ADU Permit Drawings: What to Submit Before Plan Check

Before Riverside plan checkers review your ADU application, staff verify that every required sheet and form is in your upload. Use this complete submittal checklist for both the Dwell Riverside Permit-Ready track and custom ADU plans.

MR
AutoCAD & Chief Architect Certified

Lead Architectural Designer · Build With A Plan

Marcus has delivered 50+ permit-ready drawing sets for ADUs, garage conversions, and home additions across California, Texas, Arizona, Florida, and Oregon.

Riverside ADU Permit Drawings: What to Submit Before Plan Check

Before the City of Riverside assigns a plan checker to review your accessory dwelling unit (ADU), permit technicians screen your upload for completeness. The exact set of ADU Riverside required drawings depends on whether you apply through the city's pre-approved Permit-Ready ADU Plan program (Dwell Riverside) or submit a custom design. On the Permit-Ready track, you upload five documents built around one of four city-authored plan sets and a preliminary site plan. On the custom track, you upload a complete, scaled construction document package covering site, architectural, structural, mechanical, electrical, plumbing (MEP), and California Title 24 energy compliance sheets, consolidated into one PDF per discipline.

Direct Answer: What Drawings Does Riverside Require for an ADU?

The incorporated City of Riverside accepts two ADU submittal packages through its online POSSE Public Permit Portal:

  • Path 1: Permit-Ready ADU Plans (3-business-day initial review target): Requires the selected pre-approved plan PDF (746, 800, 1,020, or 1,200 sq ft, 2025 Code edition), completed Cover Sheet (Form T1.1), a preliminary site plan from MapRiverside, a signed Hold Harmless Agreement, and a Planning ADU Express Clearance Form.
  • Path 2: Custom ADU Plans (standard plan check, estimated 6 weeks): Requires a scaled Site Plan, Architectural Plans (floor plans, four exterior elevations, roof plan, cross-sections, window and door schedules), Structural Plans and calculations, MEP drawings, Residential General Notes, and a registered Title 24 Part 6 energy report (CF1R), uploaded as one PDF per discipline after a 1-to-3-business-day completeness check.

For broader city eligibility rules, neighborhood return estimates, and local setback baselines, visit our Riverside, CA ADU design and rules guide. This guide focuses specifically on the technical drawing sheets, forms, stamp rules, and portal steps required to pass intake and clear plan check.

Step 1: Confirm City of Riverside vs. Unincorporated Riverside County

Homeowners with a "Riverside, CA" mailing address sometimes prepare the wrong permit package because postal ZIP codes cross municipal boundaries. Drawing requirements, title blocks, and portals differ between the city and the county:

  • Incorporated City of Riverside: Handled by the City of Riverside Community & Economic Development Department (CEDD) Building & Safety Division. Applications go through the city's Public Permit Portal (POSSE LMS) under Title 16 and Title 19 of the Riverside Municipal Code.
  • Unincorporated Riverside County: Neighborhoods outside city limits (such as portions of Woodcrest, Mead Valley, Highgrove, Good Hope, and Lakeland Village) fall under the Riverside County Transportation and Land Management Agency (TLMA) and use the County PLUS portal under Ordinance No. 348.

Look up your address on MapRiverside or check your property tax bill before ordering drawings. If your parcel is inside the City of Riverside boundary, the CEDD submittal rules below govern your project. You can also verify parcel jurisdiction by calling the city's One Stop Shop at 951-826-5800.

Step 2: Choose Between Permit-Ready and Custom ADU Plans

The City of Riverside separates ADU permit submittals into two tracks based on your lot and layout.

Feature Path 1: Dwell Riverside Permit-Ready Plans Path 2: Custom ADU Permit Drawings
Eligible project types Detached, single-story new construction only (4 fixed layouts) Detached, attached, garage conversion, two-story, or JADU
Available sizes 746 sq ft (1BR/1BA), 800 sq ft (2BR/2BA), 1,020 sq ft (2BR/2BA), 1,200 sq ft (3BR/2BA) Up to 1,200 sq ft detached (or 500 sq ft JADU) tailored to your lot
Architectural styles Craftsman, Ranch, or Spanish Any style meeting objective design or historic standards
Zoning and site limits Single-family zones (R-1, RE, RR, RC, RA-5); outside FEMA flood zones; not a Title 20 Cultural Resource Any residential or multifamily zone where state or local ADU law permits an ADU
Completeness check 1 to 3 business days 1 to 3 business days
Initial plan check time 3 business days target (10 business days for corrections) Standard queue, estimated 6 weeks (per city data, verified July 2026)

Path 1: What to submit for Dwell Riverside Permit-Ready ADU Plans

Under the Permit-Ready ADU Plans program, the city provides four pre-engineered, single-story detached designs updated for the 2025 California Building Standards Code (effective January 1, 2026). To qualify, your lot must be zoned single-family residential (R-1, RE, RR, RC, or RA-5), sit outside any FEMA Flood Hazard Area (verified at msc.fema.gov), and neither hold nor qualify for designation as a Cultural Resource under Title 20 of the Riverside Municipal Code (verified on the city's Historic Resources Viewer).

If your property meets all three criteria, you upload five items to the permit portal:

  1. Selected 2025-Code Standard Plan Set PDF: Downloaded from the city's Permit-Ready library (746sf_2025 Codes_v1.pdf, 800sf_2025 Codes_v1.pdf, 1020sf_2025 Codes_v1.pdf, or 1200sf_2025 Codes_v1.pdf).
  2. Completed Cover Sheet (Sheet T1.1): Downloaded from the city portal (T1.1 updated.pdf) with all highlighted site-specific fields filled in per the city's sample T1.1.
  3. Preliminary Site Plan: Created by plotting your parcel from MapRiverside to a PDF and marking the proposed ADU location. Staff use this preliminary plot to issue a project-specific conditions report.
  4. Hold Harmless Agreement: Signed by the property owner.
  5. Planning ADU Express Clearance Form: The city's express zoning form (updated July 29, 2025).

To compare how pre-approved templates work across California cities, read our guide to pre-approved ADU plans.

Path 2: When you need a custom ADU drawing package

You must submit custom ADU permit drawings if you are converting an existing garage, building an attached ADU or Junior ADU (JADU), adding a second story, building on a sloped or narrow lot where the four city templates do not fit, or developing on a parcel in a historic district or flood zone.

Step 3: Complete Checklist of ADU Riverside Required Drawings (Custom Track)

For custom projects, Riverside plan checkers evaluate your upload against the Form 101 Plan Submittal Requirements Matrix (V1.2). Drawings must be drafted to a standard architectural scale (minimum 1/4 inch = 1 foot for floor plans), dimensioned, and signed by the author. Hand-drawn sketches are not accepted.

1. Site plan

Riverside publishes a Sample Site Plan (Form 114, V1.1) showing the required graphic layout. Your site plan must show:

  • Parcel data: Assessor's Parcel Number (APN), street address, owner name, north arrow, drawing scale, and full lot dimensions.
  • Structure footprints: Dimensions and square footages of the primary home, garages, patios, and the proposed ADU.
  • Setbacks and separations: Exact distances from the ADU to front, side, and rear lot lines (minimum 4-foot side and rear setbacks for detached ADUs) and separation from existing buildings.
  • Easements, drainage, and utilities: Recorded easements, drainage flow arrows, driveway/parking layout, and water meter, gas meter, electric panel, and sewer cleanout locations.

2. Architectural sheets and general notes

Every custom set must incorporate the city's New Single-Family Dwelling Residential General Notes (updated September 15, 2026) and include:

  • Floor plans (minimum 1/4" = 1'-0" scale): Room uses, interior and exterior dimensions, ceiling heights, door and window sizes, plumbing fixtures, and mandatory laundry hookup locations.
  • Four exterior elevations: North, south, east, and west views showing grade lines, total building height, roof pitch, and exterior finish materials (plus historic compatibility details if located in a historic overlay).
  • Roof plan and cross-sections: Roof drainage, valley/hip geometry, attic ventilation, and full building sections showing foundation, wall, floor, and roof framing assemblies.
  • Schedules and details: Window schedule confirming sleeping-room egress (minimum 5.7 sq ft net clear opening), tub/shower waterproofing details, and CALGreen mandatory notes.

3. Structural plans and calculations

  • Foundation plan: Slab or raised footing dimensions, anchor bolt spacing, hold-down hardware, and rebar schedules.
  • Framing plans: Floor, wall, and roof framing layouts with joist/rafter spans, beam and header callouts, and shear wall schedules.
  • Structural calculations: Stamped lateral and vertical seismic/wind load calculations when required by structural complexity or two-story framing.

4. MEP sheets, Title 24 energy forms, and supporting reports

  • Electrical, plumbing, and mechanical (MEP) plans: Panel schedules, circuit layouts, smoke and carbon monoxide detector locations, solar-ready details, optional EV load calcs (Form 214 V1.2), water supply and DWV lines, laundry connection, and HVAC equipment and ductwork specs.
  • Title 24 Part 6 Energy Compliance (CF1R): Registered energy compliance forms for Climate Zone 10 under the 2025 California Energy Code, embedded directly onto the plan sheets.
  • Supporting reports when triggered: Site-specific soils/geotechnical reports when required by soil conditions or the engineer, a Demolition Disclosure Form (Form 121 V2.0) for conversions/demolitions, and fire sprinkler plans if the main house is sprinklered.

Pre-Submittal Worksheet: Custom Riverside ADU Drawing Package

  1. Jurisdiction verified: Parcel confirmed inside City of Riverside limits on MapRiverside.
  2. Site Plan (Form 114): Shows APN, scale, north arrow, 4-ft rear/side setbacks, footprints, and utilities.
  3. Residential General Notes: City sheet RESIDENTIAL GENERAL NOTES 9-15-26.pdf included in plan set.
  4. Architectural sheets: Scaled floor plans, 4 elevations with ridge height, roof plan, sections, and egress schedule.
  5. Structural set: Foundation plan, framing/shear wall plans, and stamped calculations (if non-prescriptive or 2-story).
  6. MEP and Title 24 CF1R: Electrical, plumbing (with laundry), mechanical, and registered 2025-code CF1R on sheets.
  7. Consolidated PDFs: Combined into one multi-page PDF per discipline before portal upload.

Step 4: Portal Upload Rules, Completeness Check, and Resubmissions

All applications submit through the Riverside Public Permit Portal. For statewide permitting context, see our ADU building permit guide. Follow three local portal procedures to avoid delays:

  1. One PDF per discipline: Per Riverside's Building Plans Submittal Process Guide (V2), upload one combined multi-page PDF per discipline rather than separate files for each sheet.
  2. 1-to-3-business-day completeness review: Staff screen uploads for 1 to 3 business days to confirm every required document is present before placing the application into the plan-check queue. Optional after-hours expedited plan review is available at hourly overtime rates under Form 137 (V2.0).
  3. Correction response rules: When responding to plan-check corrections, upload only the revised sheets marked with revision clouds and deltas, plus a separate PDF using Form 108 Revision Narrative (V1.0) listing every comment, how it was resolved, and the revised sheet number.

When Does Riverside Require a Licensed Architect or Engineer Stamp?

Riverside's Form 239: When a California Licensed Architect or Professional Engineer Is Required (V1.0) summarizes California Business and Professions Code Sections 5537 and 6737.1:

  • Conventional wood-frame exemption: Unlicensed building designers or drafters may prepare and sign plans for single-family dwellings and detached accessory structures of conventional light-frame wood construction up to two stories and a basement, provided all framing members follow prescriptive tables in the California Residential Code.
  • When a professional stamp is required: A California-licensed architect or civil/structural engineer must stamp drawings and calculations whenever a design departs from conventional framing rules, including two-story ADUs over garages with wide openings, large window walls exceeding prescriptive bracing ratios, sloped-lot foundations, or steel beams.

Find out free whether your Riverside lot qualifies before you pay for drawings.

We check your property against Riverside's zoning, setback, flood zone, and historic overlay rules at no cost. We won't even take your money unless your property qualifies.

Check my Riverside lot free →

What Drawings, Permits, and Construction Cost in Riverside

When budgeting for a Riverside ADU, separate your pre-construction service fee from government fees and physical construction costs:

  • Design and permit management (The Backyard Wealth Package): "We turn your backyard into a rental unit. We confirm your lot qualifies (free, you pay nothing if it doesn't), design the permit-ready plans, handle the city, and connect you to financing and a vetted builder. $6,000 flat, about what an architect charges just to start." Build With A Plan checks feasibility, prepares custom permit-ready construction documents (including architectural, MEP, Title 24 energy compliance, and licensed structural engineering stamps where required), manages the permit submission with the city, and connects you to financing partners and vetted builders. Permit-ready plans, accepted for submission by your city, or we revise them free.
  • Government fees and soil reports (paid directly by the homeowner): City of Riverside permit and plan-check fees run an estimated $4,217 to $6,817 (bwap-city-data.csv, last verified July 12, 2026), paid directly to the city. Impact fees apply only to ADUs 750 sq ft or larger (and school fees over 500 sq ft). If site conditions require a third-party geotechnical/soils report, expect an estimated $1,500 to $3,000.
  • Physical construction (paid directly to your builder): Build With A Plan does not perform construction; you contract directly with your builder. Estimated ADU construction cost in Riverside runs $325 to $400 per sq ft (bwap-city-data.csv, last verified July 12, 2026). For a hypothetical 750-sq-ft detached ADU, construction would run an estimated $243,750 to $300,000, separate from design and city permit fees. Compare project estimates with our ADU cost calculator.

Frequently Asked Questions About Riverside ADU Permit Drawings

What drawings are required to get an ADU permit in Riverside, CA?

Custom ADUs require a scaled Site Plan, Architectural Plans (floor plan, four elevations, roof plan, sections, and window/door schedules), Structural Plans (foundation and framing with calculations where required), MEP layouts, Riverside's Residential General Notes, and a registered Title 24 Part 6 energy report (CF1R). Permit-Ready ADU applicants submit the pre-approved city plan PDF, completed Cover Sheet T1.1, a preliminary MapRiverside site plan, a Hold Harmless Agreement, and the Planning ADU Express Clearance Form.

How long does ADU plan check take in the City of Riverside?

After a 1-to-3-business-day completeness check, applications using Riverside's Permit-Ready ADU Plans target a 3-business-day initial review (10 business days for corrections). Custom ADU plans enter the standard review queue, which takes an estimated 6 weeks (bwap-city-data.csv, verified July 2026), depending on city workload and plan completeness.

Are Riverside's Permit-Ready ADU plans updated for the 2026 building code cycle?

Yes. All four Dwell Riverside Permit-Ready ADU plan sets (746, 800, 1,020, and 1,200 sq ft) are updated to the 2025 California Building Standards Code (_2025 Codes_v1.pdf), which took effect January 1, 2026. Custom submittals must also include the September 15, 2026 edition of the city's Residential General Notes.

Can I upload individual PDF files for each drawing sheet in the Riverside portal?

No. Riverside's POSSE Public Permit Portal requires uploading one consolidated multi-page PDF per discipline (such as one PDF for construction drawings, one for structural calculations, and one for Title 24 energy compliance) rather than single-sheet PDFs.

What must be included in a plan-check correction resubmission in Riverside?

You must upload only the revised plan sheets marked with revision clouds and deltas, accompanied by a separate PDF using Riverside Form 108 (Revision Narrative) that lists each plan-check comment, explains the correction, and cites the corresponding sheet number.

Can I use Riverside's Permit-Ready ADU plans in a historic district?

No. Properties designated or eligible for designation as a Cultural Resource under Title 20 of the Riverside Municipal Code cannot use the pre-approved Permit-Ready program and must submit custom drawings that comply with historic preservation standards.


Related reading:

adu riverside california permit drawings adu permit

Stop Researching. Start Building.

Get your permit-ready drawings in 10 business days. 14-day money-back guarantee.

Get My Drawings →