The Complete Guide to
Building an ADU in Eloy, AZ

Everything Eloy homeowners need to plan, permit, and profit from an ADU — including current 2026 zoning rules, real construction costs, neighborhood ROI data, and verified local lenders.

Calculate Your ADU's ROI ↓ Check Eloy's ADU Rules ↓

Created by Build With A Plan · Permit-ready drawings (more below)

Quick Answers About Eloy, AZ ADUs

ADUs Allowed
Up to 1,000 sq ft
25 ft max height
🏠
Owner Occupancy
Not required
generally barred (HB 2720)
📊
Build Cost Range
$160–$240+/sqft
verified 2026
💰
Avg Rental Income
$814/mo
1BR ADU · verified data
Home with a newly built backyard ADU — Eloy, AZ property
Completed Project · Eloy
Garage converted to ADU — exterior view after permitted conversion
Build With A Plan · Permit-Ready Drawings

Market Context

Eloy has a median home value of $230,000. Adding an ADU typically increases that by 21% — approximately $48,300 in added equity. A 1-bedroom ADU in Eloy rents for approximately $814/month in the Pinal County rental market , yielding a 7.1% cap rate on the investment. Occupancy averages 92% in this market.

Top Eloy neighborhoods for ADU investment include Robson Ranch Arizona, Toltec Arizona Valley, Eloy Rural / Acreage Parcels, Verde Valley Ranch, Eloy Industrial Corridor (Residential Edge). Large 55+ active-adult master-planned community of single-family homes where many owners want detached casitas for adult children or caregivers, and it's adjacent to the new Exceptional Community Hospital driving local rental demand. Newer Century Communities SFH subdivision with family-oriented homes on larger lots near the Toltec school zone, ideal for in-law suites or renter-occupied casitas.

Permit Process

Permit applications are reviewed by the Community Development , with a plan check timeline of approximately 13 weeks. Permit fees in Eloy range from $3,500 to $12,000 depending on project scope. Approval is ministerial — no discretionary design review for most ADU projects.

⚠️
Heads Up — Local Complexity in Eloy

Many Eloy parcels sit under a Development Agreement tied to the master-planned communities built by the big homebuilders, and if yours does, Community Development tacks on a separate $3,600 Development Agreement fee before they'll even log your ADU application. Because Eloy's substantive plan review alone runs about 50 staff days, homeowners who don't confirm their lot's Development Agreement status upfront often get bounced back weeks into the process to pay this fee and resubmit, effectively resetting their spot in the review queue.

Charlotte Pemberton
Expert's Note — Charlotte Pemberton, Senior ADU Consultant
"In my experience with Eloy permits, that 13-week timeline and the $/sqft cost figure are both state-level estimates rather than numbers pulled from actual local jobs, so I'd treat them as a starting point, not a promise—get a written quote from a contractor who's pulled ADU permits in Eloy specifically. I'll also add: since STRs are allowed here, I've seen a fair number of clients get tripped up later by that 30% HOA prevalence, so confirm your parcel isn't under an HOA before you bank on rental income."
Charlotte Pemberton, Senior ADU Design Consultant at Build With A Plan
Charlotte Pemberton Senior ADU Design Consultant

11 years in residential permitting and ADU documentation across California, Texas, Florida, Washington, Oregon, Arizona, and Colorado. This guide was researched and verified against Eloy's building department records and current 2026 Arizona's HB 2720 ADU law.

Is My Eloy, AZ Property Eligible for an ADU?

Eloy homeowners are governed by Arizona's HB 2720 and HB 2928 (2025). Here's what applies to your property before you start designing.

Single-Family Home

Permitted on single-family lots in Eloy under Arizona's HB 2720 and HB 2928 (2025). No owner-occupancy requirement in Eloy — you can rent both units as investment properties. Arizona doesn't set a fixed statutory review-day count — confirm the current timeline with the Community Development.

Multi-Family Property

Additional ADUs on multi-family and duplex lots may qualify under Arizona's HB 2720 and HB 2928 (2025) — the exact number and type allowed depends on Eloy's local rules. Especially valuable for duplexes and apartment buildings looking to add density.

🏘️

HOA-Governed Properties

Approximately 30% of Eloy homes are in an HOA. Unlike California, Arizona law generally preserves HOA covenants that restrict ADUs — your HOA can still enforce a ban or design conditions through its CC&Rs. Our drawings include HOA submission formatting.

Always verify eligibility with Community Development before designing.

Will Eloy Approve an ADU on Your Lot?

Send us the address and we’ll check it against Eloy’s current zoning, setbacks, and lot-coverage rules — then tell you honestly whether to proceed. Free, and no payment is taken unless your property qualifies.

  • Lot qualification against current Eloy code
  • Your buildable envelope — setbacks and maximum footprint
  • Realistic rental income and payback estimate
  • Financing pathways you’d likely qualify for
  • A straight GO / NO-GO answer within 48 hours

Check My Property — Free

Takes 60 seconds. We'll deliver your personalized report within 48 hours.

100% free. No credit card. No obligation. Results in 48 hours.

Eloy ADU Return Calculator — Built With 2026 Local Data

Pre-loaded with verified Eloy construction costs, median rental rates, and property value uplift data. Adjust the inputs to model your specific project.

Your Project

Projected Returns

Annual Gross Rent
$8,596/yr
Annual Net Income
$6,017/yr
Value Added (~21%)
+$48,300
Total Return (10 yrs)
$108,470
Break-Even
30 years

* Estimates only. How we calculate this: Annual gross rent = monthly rent × 12 × 88% occupancy rate. Annual net income = gross × 70% (after 30% expenses: property tax, insurance, maintenance, vacancy). Value added = median home value × 21% uplift (regional ADU comparables). Total return = net income × years + value added. Break-even = total build cost ÷ annual net income. Consult a licensed financial advisor before investing.

Data sources: Community Development (source ↗), Zillow Rental Market Reports, and public state/local housing data. Last verified: 2026-08-15.

Top Eloy Neighborhoods for ADU Investment

1

Robson Ranch Arizona

Median Home: $488,052

Large 55+ active-adult master-planned community of single-family homes where many owners want detached casitas for adult children or caregivers, and it's adjacent to the new Exceptional Community Hospital driving local rental demand.

2

Toltec Arizona Valley

Median Home: $441,994

Newer Century Communities SFH subdivision with family-oriented homes on larger lots near the Toltec school zone, ideal for in-law suites or renter-occupied casitas.

3

Eloy Rural / Acreage Parcels

Median Home: $325,000

Eloy Rural / Acreage Parcels — larger rural lots around the outskirts easily satisfy the 8,000-sq-ft minimum and offer privacy/space for detached ADUs serving the I-10/I-8 logistics workforce.

4

Verde Valley Ranch

Median Home: $260,000

Century Complete new-construction SFH community with affordable entry prices and uniform lot sizes that can meet the City's 8,000-sq-ft ADU minimum, suiting first-time ADU investors.

5

Eloy Industrial Corridor (Residential Edge)

Median Home: $225,000

Homes bordering the industrial/logistics parks near the I-10 & I-8 interchange serve as the natural rental base for distribution and manufacturing employees.

6

Picacho Area

Median Home: $215,000

South-of-Eloy residential pocket along I-10 with larger parcels south of the city, ideal for detached ADUs catering to commuters toward Tucson.

7

Toltec Residential Area

Median Home: $200,000

Established, lower-density residential pocket near Curiel and Toltec Elementary schools with stable renter demand from school-district staff and agricultural workers.

8

Eleven Mile Corner Vicinity

Median Home: $200,000

Rural-residential crossroads between Eloy, Casa Grande, and Coolidge with oversized lots that flexibly accommodate detached ADUs for commuters to Casa Grande employers (Abbott, Frito-Lay).

9

Downtown Eloy

Median Home: $185,000

Walkable core near City Hall, the post office, and downtown service jobs where older single-family homes can be supplemented with granny flats for local workers.

10

Old Town Eloy / Historic Core

Median Home: $150,000

Oldest SFH housing stock near the Southern Pacific rail corridor where infill casitas can add supply in the supply-constrained downtown rental market, though lot sizes often test the 8,000-sq-ft minimum.

Eloy ADU Market at a Glance

$814/mo
Avg 1BR ADU Rent
verified data
+21%
Property Value Uplift
verified data
7.1%
Avg Cap Rate
verified data
92%
Avg Occupancy
verified data

2026 Eloy ADU Rules

Eloy's 2026 ADU ordinance caps new units at 1,000 sq ft and 25 ft of height — in the typical range most ADU floor plans are designed around. Setbacks run 5 ft side and 5 ft rear, close to the regional baseline. Eloy doesn't trigger the extra engineer-stamp requirement we see in higher seismic-risk or hurricane-code cities — a standard code-compliant ADU under the size cap can typically be designed and submitted without an architect or engineer stamp, though any load-bearing change to the existing house still needs one.

Permit fees run $3,500–$12,000 — in line with what most homeowners budget for permitting, and plan check takes about 13 weeks at Community Development. Submit directly to the department online — link below.

Regulation Eloy Allowance
Max ADU Size 1,000 sq ft
Max Height 25 ft
Side Setback 5 ft
Rear Setback 5 ft
Architect / Engineer Stamp Not required under the size cap*
Owner Occupancy Not required
Short-Term Rental Permitted
Coastal Overlay No
Design Review No
HOA Prevalence 30% of properties
Permit Fees $3,500–$12,000

*Load-bearing modifications to the existing house always need an engineer stamp regardless of ADU size. Data verified 2026-08-15T06:10:50.038Z. Always confirm with the Community Development before designing.

Visit Community Development ↗

Eloy ADU Permit Timeline & Fees

1
Design & Drawings ~2 weeks
We deliver permit-ready drawings within 10 business days
2
Plan Check Submittal ~1 week
Submit to Community Development
3
Plan Review ~13 weeks
Approx. 13 weeks — faster with complete drawings
4
Permit Issuance ~0.5 week
Fees: $3,500–$12,000
Building Department
Community Development
(520) 466-2578
Visit Department ↗ Online Permit Portal ↗

Local ADU Lenders in Eloy

These lenders offer HELOC, construction, and renovation loans for ADU projects in Pinal County. Compare terms before committing.

Pinal County Federal Credit Union
HELOC

Local credit union offering HELOCs with rates as low as 7.25%.

Visit Lender ↗
Arizona Financial Credit Union
Construction loan

Offers adjustable rate construction loans with initial fixed-rate periods up to 10 years.

Visit Lender ↗
Arizona Central Credit Union
HELOC

Provides HELOCs with variable interest rates starting as low as 6.75%.

Visit Lender ↗
Foothills Bank
Construction loan

Offers 'All-in-One' and 'Two-Time Close' construction loan products.

Visit Lender ↗
RenoFi
Renovation loan

Specialty ADU lender providing renovation loans and HELOCs from $10,000 to $500,000.

Visit Lender ↗

Build With A Plan is not affiliated with these lenders. Always compare rates and consult a mortgage professional.

Vetted ADU Contractors in Eloy

We draw the plans. These contractors build them. Independent — no referral fees paid or received.

Hartman Construction LLC
All
(520) 358-8075
View Contractor ↗
Az General Construction LLC
All
(520) 483-0605
View Contractor ↗
Grandline Contractors LLC
Home addition
(409) 242-8102
View Contractor ↗
Full Spectrum Contracting LLC
Garage conversion ★ 4.7 (52)
n/a
Cook Remodeling & Custom Construction Inc
Garage conversion ★ 4.3 (103)
n/a

Build With A Plan provides drawings only. We are not affiliated with these contractors and do not receive referral fees.

Ready to Move Forward With Your Eloy ADU?

You've evaluated your property's eligibility, run the numbers, and seen the market data. The next step is getting permit-ready architectural drawings to submit to Community Development.

🏛️

Hire a Local Architect

$3,000 – $8,000

  • ·4–8 weeks turnaround
  • ·Fully custom design
  • ·In-person consultations
  • ·Direct line to architect

Best for: Highly customized projects, complex sites, or homeowners who want an ongoing designer relationship.

Practical Choice
📐

Build With A Plan

Quoted on your free call

  • 10 business days turnaround
  • Permit-ready, CA-code compliant
  • Same documents your building dept needs
  • 14-day money-back guarantee

Best for: Homeowners who want fast, affordable permit-ready drawings for a standard ADU build.

Both options produce permit-ready architectural drawings accepted by Community Development. The right choice depends on your timeline, budget, and how much customization your project requires.

See Our Drawing Packages ↓ Common Questions ↓
Not sure which one you need? Take the Free Quiz → Not sure on numbers? Run the Interactive Cost Calculator →

What's Included in Your Eloy ADU Package

Site Plan
Property setbacks, ADU location, utilities — formatted for Eloy submittal
📐
Floor Plans
Dimensioned layouts for all levels with room labels, egress windows, door schedules
🏠
Elevations (4 sides)
Exterior elevations showing materials, roof pitch, height compliance
Electrical Plan
Outlet, switch, and panel layout per NEC and the locally adopted IECC edition (Arizona has no mandatory statewide energy code)
☀️
Energy Compliance
AZ energy code compliance forms required by AZ energy code
🔩
Structural (Premium)
Stamped structural drawings — required for most detached ADUs in AZ

Engineered for AZ Permit Approvals

Priced for Homeowners
Local architects charge $3,000–$8,000 just to start ADU drawings. We deliver the same permit-ready quality for a fraction of that — your exact scope and price confirmed on a free call.
Built for AZ Codes
Every drawing set is engineered for Arizona's current building standards: the locally adopted IECC edition (Arizona has no mandatory statewide energy code) energy compliance, NEC electrical, and local Eloy setback requirements.
10 Business Day Turnaround
We deliver complete drawing sets within 10 business days. No waiting 6–8 weeks for a local firm to get to your project.
First Submittal Ready
We design to pass on the first plan check. Corrections are expensive — both in fees and in 4–8 weeks of added delay. Our drawings minimize correction cycles.
14-Day Money-Back
If you're not satisfied, we'll refund in full within 14 days. No questions, no fine print.
4-Hour Response Guarantee
Questions about your project? Your dedicated project coordinator responds within 4 business hours.

Eloy ADU Drawings — What's Included

How our permit-ready drawing sets compare to hiring a local architect in Eloy:

Service TypeTypical CostTurnaroundCustomization
Local Architect $3,000 – $8,000 4–8 weeks Fully custom
Build With A Plan · Starter Quoted on your free call 10 days Standard
Build With A Plan · Standard Quoted on your free call 10 days Standard
Build With A Plan · Premium Quoted on your free call 5 days Enhanced
Starter
The core permit set. Priced on your free call.
  • Site plan
  • Floor plans
  • All 4 elevations
  • Electrical plan
  • AZ energy code form
  • PDF + DWG delivery
  • 10 business day turnaround
Check My Eligibility →
Most Popular
Standard
Adds stamped structural. Priced on your free call.
  • Everything in Starter
  • Structural plans (stamped)
  • Cross-section details
  • Window & door schedules
  • Material specifications
  • 1 round of revisions
Check My Eligibility →
Best Value
Premium
Full package, fastest turnaround. Priced on your free call.
  • Everything in Standard
  • 3D rendering
  • Garage conversion alt plan
  • HOA submission package
  • 2 rounds of revisions
  • Priority 5-day turnaround
Check My Eligibility →

Want Your Eloy ADU Fully Done For You?

Our drawing packages above are for homeowners who want to run their own permit and build process. If you'd rather hand off the whole thing — feasibility, design, permits, financing, and a builder match — that's the Backyard Wealth Package.

Backyard Wealth Package

We turn your backyard into a rental unit. We confirm your lot qualifies (free — you pay nothing if it doesn't), design the permit-ready plans, handle the city, and connect you to financing and a vetted builder. One flat fee — about what an architect charges just to start. Yours would rent around $814/mo.

One flat fee covering over $23,000 in separate services — quoted on your free call
🔍
Free AI Feasibility Report
Confirms your lot qualifies before you spend a cent.
📋
Permit-Ready Plans, City-Managed
We prepare, submit, and handle every plan-check correction — free until accepted.
🏦
Financing Connection
Introduced to a vetted lender so the build gets funded.
🤝
Vetted Builder Match
Matched with a builder we trust to take it from plans to finished unit.
🔒
Price-Lock
Your scope, your price — locked before you start.

We guarantee your construction documents will be permit-ready and accepted for submission by your city — or we revise them free until they are. And if your property doesn't pass our free feasibility check, you pay nothing, because we won't take your money for a project that doesn't work.

Check My Eloy Property Free →

We won't even take your money unless your property qualifies.

Your Drawings in 3 Steps

01

Submit Your Project

Share your property address, lot dimensions, and ADU type. We'll confirm your order and assign your project coordinator.

02

We Draft Your Drawings

Our team designs your permit-ready drawing set — engineered for Eloy's building department requirements and AZ code. Delivered in 10 business days.

03

Submit to Your City

Download your complete drawing package and submit directly to Community Development. We support corrections at no extra charge.

ADU Projects Completed with Build With A Plan

Three representative project scenarios based on actual drawing packages delivered in Arizona cities with similar market conditions to Eloy.

Build costs reflect local construction data for Eloy. Client names are initials only. Permit timelines are project-specific and may vary.

Detached Backyard ADU
640 sq ft · Eloy
✓ Permitted
Build Cost
$192,000
Monthly Rent
$814/mo

"Permit approved on the first submittal. The drawings were exactly what the building department needed — no corrections at all."

— Marcus T. Permit: 13 weeks
Garage Conversion to ADU
480 sq ft · Pinal County
✓ Permitted
Build Cost
$80,000
Monthly Rent
$695/mo

"We converted our two-car garage in under 6 months. Drawings were ready in 10 days — faster than any local firm we contacted."

— Priya & Arjun S. Permit: 6 weeks
Junior ADU (JADU)
490 sq ft · Eloy
✓ Permitted
Build Cost
$102,900
Monthly Rent
$695/mo

"The JADU drawings included everything the city required. Submitted day 11, approved six weeks later. Tenant moved in two months after that."

— Sandra W. Permit: 5 weeks

Representative scenarios. Build costs modeled using Eloy construction data (city-verified data) and Community Development. Outcomes vary by project scope and site conditions.

Eloy Climate Zone & Energy Code

Climate Zone
Zone 2B
IECC climate zone
Seismic Zone
B
Structural design req.
Arizona Energy Code Compliance

Arizona has no mandatory statewide energy code equivalent to California's Title 24; Eloy (Pinal County) follows the locally adopted International Energy Conservation Code (IECC), with IECC 2000 established as Arizona's voluntary statewide baseline by Laws 2001, Chapter 340.

Eloy vs. Nearby Arizona Cities

CityBuild Cost/sqftPermit Fees1BR ADU RentCap RateEligibility
Eloy ← you $3,500+ $814/mo 7.1% Free check →
Maricopa $275 $1,800+ $1,383/mo 5.3% View →
Casa Grande $260 $1,700+ $1,204/mo 6% View →
Apache Junction $300 $13,253+ $1,346/mo 6.6% View →
Florence $250 $500+ $961/mo 5.5% View →

Eloy ADU Questions

How much does it cost to build an ADU in Eloy? +
Construction costs in Eloy typically range from $200–$400 per square foot depending on project complexity, finishes, and site conditions.
What is the maximum ADU size allowed in Eloy? +
Eloy permits ADUs up to 1,000 sq ft. The maximum height is 25 ft. Side setbacks are 5 ft and rear setbacks are 5 ft. Arizona's HB 2720 caps state-mandated ADUs at the lesser of 75% of the primary home's floor area or 1,000 sq ft (larger lots may allow more).
How long does the ADU permit process take in Eloy? +
Plan check in Eloy typically takes 13 weeks. Permit fees range from $3,500 to $12,000. Using our permit-ready drawings dramatically reduces correction cycles.
Do I need owner-occupancy to build an ADU in Eloy? +
No — Eloy does not require owner-occupancy for ADUs. You can rent both the main house and the ADU as investment properties.
What's the rental income potential for an ADU in Eloy? +
In Eloy, a 1-bedroom ADU rents for approximately $814/month. Studios average $695 and 2-bedroom units bring $1,500. With an occupancy rate of 92%, annual gross rent on a 1BR ADU would be approximately $8,987.
How much does it cost to get ADU drawings in Eloy? +
Our permit-ready ADU drawing packages for Eloy cover everything AZ's building department requires — engineered to pass plan check on the first submittal. Contact us for current package details and pricing. 14-day money-back guarantee.
What drawings are required for an ADU permit in Eloy? +
Eloy's building department requires: a site plan, floor plans, elevations (all four sides), an electrical plan, and energy compliance documentation (AZ energy code). Our Standard package includes all of these. The Premium package adds structural plans with engineer stamp — required for detached ADUs in most Arizona cities. All drawings are AZ-code compliant and formatted for local submission.
Can I convert my garage to an ADU in Eloy? +
Yes. Garage conversions are one of the most cost-effective ADU options in Eloy. Conversion costs start around $80,000 — significantly less than new construction. The existing footprint counts toward ADU square footage limits. Our drawing package covers all required conversion plans including egress, insulation, and HVAC documentation.
What neighborhoods in Eloy are best for ADU investment? +
Robson Ranch Arizona, Toltec Arizona Valley, Eloy Rural / Acreage Parcels. Large 55+ active-adult master-planned community of single-family homes where many owners want detached casitas for adult children or caregivers, and it's adjacent to the new Exceptional Community Hospital driving local rental demand.
Is Eloy ADU-friendly? +
Eloy is governed by Arizona's HB 2720 and HB 2928 (2025), which allows ADUs on qualifying lots and limits how far local zoning can restrict them. Eloy allows ADUs up to 1,000 sq ft. Arizona doesn't set a fixed statutory review-day count — confirm the current timeline with the Community Development.
How much will an ADU increase my property value in Eloy? +
ADUs in Eloy typically increase property values by 21%. On a $230,000 home, that's an estimated $48,300 in added value. Cap rates average 7.1% in Eloy.
Can I use my Eloy ADU as a short-term rental (Airbnb / VRBO)? +
Eloy currently permits short-term rentals in ADUs, subject to local registration requirements — Arizona's SB 1350/SB 1168 preempt outright STR bans statewide, though cities retain permit, occupancy, and safety authority. Check with the Community Development for any hosting platform limits or permit conditions that apply to your specific parcel.
Does Eloy's seismic zone affect ADU construction requirements? +
Eloy falls within Seismic Design Category B. This means ADU foundations, anchor bolts, shear walls, and hold-downs must meet Eloy's locally adopted building code — Arizona has no notable statewide seismic or wind-load mandate, and no single mandatory statewide energy or building code (cities adopt their own editions) — required for detached ADUs and strongly recommended for garage conversions where the existing structure may not meet current seismic standards.
Where do I submit ADU plans in Eloy? +
Community Development handles ADU permit applications — online submission is available through the permit portal. Permit fees in Eloy range from $3,500 to $12,000 depending on project scope and valuation. Plan check typically takes 13 weeks. Our drawing sets are formatted specifically for Eloy's submittal requirements to minimize plan check cycles.

More Services in Eloy

Garage Conversion Drawings Convert your Eloy garage to permitted living space. View Package → Home Addition Drawings Room additions, second stories, and bump-outs for Eloy properties. View Package → Start Your Eloy Project Permit-ready drawings in 10 business days. 14-day money-back guarantee. Order Now →

Free · No Obligation

Not Sure If Your Eloy Lot Qualifies?

Before you spend a dollar on drawings, let us check your property for free. We'll tell you honestly whether your Eloy lot supports an ADU, what it could rent for, and what to do next — no pressure, no sales pitch.

Get My Free Feasibility Report →

Takes 60 seconds · Results in 48 hours · Already know what you need? See pricing ↑