The Complete Guide to
Building an ADU in Miami Beach, FL

Everything Miami Beach homeowners need to plan, permit, and profit from an ADU — including current 2026 zoning rules, real construction costs, neighborhood ROI data, and verified local lenders.

Calculate Your ADU's ROI ↓ Check Miami Beach's ADU Rules ↓

Created by Build With A Plan · Permit-ready drawings (more below)

Quick Answers About Miami Beach, FL ADUs

ADUs Allowed
Up to 1,500 sq ft
20 ft max height
🏠
Owner Occupancy
Not required
set by local ordinance
📊
Build Cost Range
$230–$400+/sqft
verified 2026
💰
Avg Rental Income
$2,950/mo
1BR ADU · verified data
Home with a newly built backyard ADU — Miami Beach, FL property
Completed Project · Miami Beach
Garage converted to ADU — exterior view after permitted conversion
Build With A Plan · Permit-Ready Drawings

Market Context

Miami Beach has a median home value of $630,000. Adding an ADU typically increases that by 25% — approximately $157,500 in added equity. A 1-bedroom ADU in Miami Beach rents for approximately $2,950/month in the Miami-Dade County rental market , yielding a 5.8% cap rate on the investment. Occupancy averages 96% in this market.

Top Miami Beach neighborhoods for ADU investment include Normandy Isles, Nautilus, La Gorce, Bayshore, North Shore. High single-family home density with moderate lot sizes near Mount Sinai and relatively affordable median values make ADUs feasible and in-demand. Large lots and an existing single-family fabric provide space for detached ADUs and strong long-term rental demand.

Permit Process

Permit applications are reviewed by the City of Miami Beach Building Department , with a plan check timeline of approximately 7 weeks. Permit fees in Miami Beach range from $2,500 to $10,000 depending on project scope. Design review: Yes - in historic districts and Neighborhood Conservation Districts (design review/Certificate of Appropriateness or Certificate of Compliance required); otherwise ADUs are reviewed administratively by the Planning & Zoning Director

Miami Beach properties within the Coastal Overlay Zone require a Coastal Development Permit (CDP) in addition to standard building permits. CDPs add 2–6 months to the permit timeline and require compliance with both local ordinances and applicable state coastal zone management standards.

⚠️
Heads Up — Local Complexity in Miami Beach

Because Miami Beach sits inside the state-mandated Coastal Construction Control Line, most ADU projects need a separate Coastal Development Permit on top of the standard building permit, and that review alone can tack on 6-8 weeks since it requires FEMA flood elevation certificates and often a survey showing your exact distance from the erosion control line. On top of that, older homes in neighborhoods like Flamingo Park or Nautilus often have galvanized or cast-iron water laterals that won't meet code for an added unit, so the city forces a full sewer lateral inspection — and if it fails, you're looking at a $10,000-$15,000 utility upgrade before your ADU permit gets final sign-off. Since short-term rentals aren't allowed here, plenty of buyers assume they can Airbnb the new unit, only to find out during permitting that the city will flag the certificate of occupancy application if the intended use looks transient.

Charlotte Pemberton
Expert's Note — Charlotte Pemberton, Senior ADU Consultant
"In my experience, that 7-week timeline and $325/sqft figure are Miami Beach state-level estimates, not verified local numbers — I'd get at least two local contractor quotes and call the City of Miami Beach Building Department directly before budgeting around them. What the data also doesn't show is that coastal overlay properties here almost always trigger a CDP review that can add months, so a sub-8-week estimate rarely holds once that process kicks in."
Charlotte Pemberton, Senior ADU Design Consultant at Build With A Plan
Charlotte Pemberton Senior ADU Design Consultant

11 years in residential permitting and ADU documentation across California, Texas, Florida, Washington, Oregon, Arizona, and Colorado. This guide was researched and verified against Miami Beach's building department records and current 2026 Florida's local zoning ordinances.

Is My Miami Beach, FL Property Eligible for an ADU?

Miami Beach homeowners are governed by local zoning ordinances — Florida law (§163.31771) only encourages, but does not mandate, local ADU approval. Here's what applies to your property before you start designing.

Single-Family Home

Permitted on single-family lots in Miami Beach under local zoning ordinances — Florida law (§163.31771) only encourages, but does not mandate, local ADU approval. No owner-occupancy requirement in Miami Beach — you can rent both units as investment properties. Review process and timelines are set by local ordinance — confirm the current process with the City of Miami Beach Building Department before designing.

Multi-Family Property

Additional ADUs on multi-family and duplex lots may qualify under local zoning ordinances — Florida law (§163.31771) only encourages, but does not mandate, local ADU approval — the exact number and type allowed depends on Miami Beach's local rules. Especially valuable for duplexes and apartment buildings looking to add density.

🏘️

HOA-Governed Properties

Approximately 33% of Miami Beach homes are in an HOA. Florida Statute §720.3035 limits HOA control over certain interior changes but does not preempt CC&Rs that ban ADUs outright — Florida HOAs generally retain the ability to restrict ADUs through their covenants. Our drawings include HOA submission formatting.

⚠️

Coastal Zone Properties

Properties within Miami Beach's Coastal Overlay Zone require a Coastal Development Permit (CDP) in addition to standard building permits. This adds 2–6 months to the timeline. Our drawings flag coastal requirements and meet both local and applicable state coastal zone management standards.

🏛️

Historic Districts

Yes - in historic districts and Neighborhood Conservation Districts (design review/Certificate of Appropriateness or Certificate of Compliance required); otherwise ADUs are reviewed administratively by the Planning & Zoning Director

Always verify eligibility with City of Miami Beach Building Department before designing.

Will Miami Beach Approve an ADU on Your Lot?

Send us the address and we’ll check it against Miami Beach’s current zoning, setbacks, and lot-coverage rules — then tell you honestly whether to proceed. Free, and no payment is taken unless your property qualifies.

  • Lot qualification against current Miami Beach code
  • Your buildable envelope — setbacks and maximum footprint
  • Realistic rental income and payback estimate
  • Financing pathways you’d likely qualify for
  • A straight GO / NO-GO answer within 48 hours

Check My Property — Free

Takes 60 seconds. We'll deliver your personalized report within 48 hours.

100% free. No credit card. No obligation. Results in 48 hours.

Miami Beach ADU Return Calculator — Built With 2026 Local Data

Pre-loaded with verified Miami Beach construction costs, median rental rates, and property value uplift data. Adjust the inputs to model your specific project.

Your Project

Projected Returns

Annual Gross Rent
$31,152/yr
Annual Net Income
$21,806/yr
Value Added (~25%)
+$157,500
Total Return (10 yrs)
$375,560
Break-Even
9 years

* Estimates only. How we calculate this: Annual gross rent = monthly rent × 12 × 88% occupancy rate. Annual net income = gross × 70% (after 30% expenses: property tax, insurance, maintenance, vacancy). Value added = median home value × 25% uplift (regional ADU comparables). Total return = net income × years + value added. Break-even = total build cost ÷ annual net income. Consult a licensed financial advisor before investing.

Data sources: City of Miami Beach Building Department (source ↗), Zillow Rental Market Reports, and public state/local housing data. Last verified: 2026-07-12.

Top Miami Beach Neighborhoods for ADU Investment

1

Normandy Isles

Median Home: $323,000

High single-family home density with moderate lot sizes near Mount Sinai and relatively affordable median values make ADUs feasible and in-demand.

2

Nautilus

Median Home: $3,499,000

Large lots and an existing single-family fabric provide space for detached ADUs and strong long-term rental demand.

3

La Gorce

Median Home: $3,207,500

Exclusively single-family with very large lots (median lot ~9,100 sq ft) ideal for detached ADUs.

4

Bayshore

Median Home: $985,516

Stable single-family neighborhood with mid-size lots and good proximity to city amenities and jobs.

5

North Shore

Median Home: $397,692

Strong single-family pockets and more moderate prices increase owner-occupier ADU opportunities.

6

Venetian Islands / Palm Island

Median Home: $9,215,000

Very large lots and single-family character provide physical feasibility for detached ADUs, though values are high.

7

Sunset Harbour

Median Home: $980,000

Close to South Beach jobs and tourism; solid rental demand, and some single-family lots that can host ADUs.

8

Flamingo/Lummus (Central South Beach)

Median Home: $336,241

Central South Beach location with strong rental demand and some single-family parcels suitable for ADUs.

9

South Pointe / South of Fifth

Median Home: $1,107,059

Exceptional rental demand due to South Beach location; limited single-family supply but high returns where ADUs are possible.

10

North Beach (general)

Median Home: $419,621

Broader North Beach area has more single-family stock and proximity to Mount Sinai, supporting ADU demand.

Miami Beach ADU Market at a Glance

$2,950/mo
Avg 1BR ADU Rent
verified data
+25%
Property Value Uplift
verified data
5.8%
Avg Cap Rate
verified data
96%
Avg Occupancy
verified data

2026 Miami Beach ADU Rules

Miami Beach's 2026 ADU ordinance caps new units at 1,500 sq ft and 20 ft of height — generous — enough room for a full 2-bedroom layout. Setbacks run wide — 8 ft side / 8 ft rear — which pushes the buildable envelope toward the center of the lot. Because of FL's statewide wind-load provisions (Florida Building Code wind design / High-Velocity Hurricane Zone rules), structural drawings for a detached ADU here need a licensed engineer's stamp — architectural sheets for a code-compliant unit under the size cap generally don't.

Permit fees run $2,500–$10,000 — in line with what most homeowners budget for permitting, and plan check takes about 7 weeks at City of Miami Beach Building Department. Submit directly to the department online — link below.

Regulation Miami Beach Allowance
Max ADU Size 1,500 sq ft
Max Height 20 ft
Side Setback 8 ft
Rear Setback 8 ft
Architect / Engineer Stamp Required for structural — FL's statewide wind-load provisions (Florida Building Code wind design / High-Velocity Hurricane Zone rules)
Owner Occupancy Not required
Short-Term Rental Restricted
Coastal Overlay Yes — CDP may be required
Design Review Yes - in historic districts and Neighborhood Conservation Districts (design review/Certificate of Appropriateness or Certificate of Compliance required); otherwise ADUs are reviewed administratively by the Planning & Zoning Director
HOA Prevalence 33% of properties
Permit Fees $2,500–$10,000

*Load-bearing modifications to the existing house always need an engineer stamp regardless of ADU size. Data verified 2026-07-12T23:00:00.000Z. Always confirm with the City of Miami Beach Building Department before designing.

Visit City of Miami Beach Building Department ↗

Miami Beach ADU Permit Timeline & Fees

ℹ Timeline and fee estimates are based on regional averages. Actual Miami Beach data coming soon.

1
Design & Drawings ~2 weeks
We deliver permit-ready drawings within 10 business days
2
Plan Check Submittal ~1 week
Submit to City of Miami Beach Building Department
3
Plan Review ~7 weeks
Approx. 7 weeks — faster with complete drawings
4
Permit Issuance ~0.5 week
Fees: $2,500–$10,000
Building Department
City of Miami Beach Building Department
(305) 673-7610
Visit Department ↗ Online Permit Portal ↗

Local ADU Lenders in Miami Beach

These lenders offer HELOC, construction, and renovation loans for ADU projects in Miami-Dade County. Compare terms before committing.

Ocean Bank
HELOC

A revolving line of credit based on home equity, allowing homeowners to borrow as needed for ADU construction.

Visit Lender ↗
City National Bank of Florida
HELOC

Offers APRs ranging from 4.00% to 18.00% depending on creditworthiness for home equity use.

Visit Lender ↗
BankUnited
HELOC

Allows homeowners to use equity to finance home improvements like ADUs through loans or lines of credit.

Visit Lender ↗
Dade County Federal Credit Union
HELOC

A flexible, revolving line of credit from a local credit union that allows borrowing as needed up to an approved limit.

Visit Lender ↗
RenoFi
Renovation loan

Specialty lender providing loans based on the home's future value, partnering with local credit unions.

Visit Lender ↗

Build With A Plan is not affiliated with these lenders. Always compare rates and consult a mortgage professional.

Vetted ADU Contractors in Miami Beach

We draw the plans. These contractors build them. Independent — no referral fees paid or received.

JMK Miami Contractor Corp
All
(305) 422-9676
View Contractor ↗
Rausa Builders, Corp (MiamiAdditions)
Home addition
(305) 554-5711
View Contractor ↗
Bianchi & Florez Construction
All
(305) 846-1347
View Contractor ↗
Peterbilt Construction Inc.
All
(305) 538-6727
View Contractor ↗
State Upgrades
All
(786) 420-4895
View Contractor ↗

Build With A Plan provides drawings only. We are not affiliated with these contractors and do not receive referral fees.

Ready to Move Forward With Your Miami Beach ADU?

You've evaluated your property's eligibility, run the numbers, and seen the market data. The next step is getting permit-ready architectural drawings to submit to City of Miami Beach Building Department.

🏛️

Hire a Local Architect

$3,000 – $8,000

  • ·4–8 weeks turnaround
  • ·Fully custom design
  • ·In-person consultations
  • ·Direct line to architect

Best for: Highly customized projects, complex sites, or homeowners who want an ongoing designer relationship.

Practical Choice
📐

Build With A Plan

Quoted on your free call

  • 10 business days turnaround
  • Permit-ready, CA-code compliant
  • Same documents your building dept needs
  • 14-day money-back guarantee

Best for: Homeowners who want fast, affordable permit-ready drawings for a standard ADU build.

Both options produce permit-ready architectural drawings accepted by City of Miami Beach Building Department. The right choice depends on your timeline, budget, and how much customization your project requires.

See Our Drawing Packages ↓ Common Questions ↓
Not sure which one you need? Take the Free Quiz → Not sure on numbers? Run the Interactive Cost Calculator →

What's Included in Your Miami Beach ADU Package

Site Plan
Property setbacks, ADU location, utilities — formatted for Miami Beach submittal
📐
Floor Plans
Dimensioned layouts for all levels with room labels, egress windows, door schedules
🏠
Elevations (4 sides)
Exterior elevations showing materials, roof pitch, height compliance
Electrical Plan
Outlet, switch, and panel layout per NEC and the Florida Building Code, Energy Conservation (8th Edition)
☀️
Energy Compliance
Florida energy code compliance forms required by FL energy code
🔩
Structural (Premium)
Stamped structural drawings — required for most detached ADUs in FL

Engineered for FL Permit Approvals

Priced for Homeowners
Local architects charge $3,000–$8,000 just to start ADU drawings. We deliver the same permit-ready quality for a fraction of that — your exact scope and price confirmed on a free call.
Built for FL Codes
Every drawing set is engineered for Florida's current building standards: the Florida Building Code, Energy Conservation (8th Edition) energy compliance, NEC electrical, and local Miami Beach setback requirements.
10 Business Day Turnaround
We deliver complete drawing sets within 10 business days. No waiting 6–8 weeks for a local firm to get to your project.
First Submittal Ready
We design to pass on the first plan check. Corrections are expensive — both in fees and in 4–8 weeks of added delay. Our drawings minimize correction cycles.
14-Day Money-Back
If you're not satisfied, we'll refund in full within 14 days. No questions, no fine print.
4-Hour Response Guarantee
Questions about your project? Your dedicated project coordinator responds within 4 business hours.

Miami Beach ADU Drawings — What's Included

How our permit-ready drawing sets compare to hiring a local architect in Miami Beach:

Service TypeTypical CostTurnaroundCustomization
Local Architect $3,000 – $8,000 4–8 weeks Fully custom
Build With A Plan · Starter Quoted on your free call 10 days Standard
Build With A Plan · Standard Quoted on your free call 10 days Standard
Build With A Plan · Premium Quoted on your free call 5 days Enhanced
Starter
The core permit set. Priced on your free call.
  • Site plan
  • Floor plans
  • All 4 elevations
  • Electrical plan
  • Florida energy code form
  • PDF + DWG delivery
  • 10 business day turnaround
Check My Eligibility →
Most Popular
Standard
Adds stamped structural. Priced on your free call.
  • Everything in Starter
  • Structural plans (stamped)
  • Cross-section details
  • Window & door schedules
  • Material specifications
  • 1 round of revisions
Check My Eligibility →
Best Value
Premium
Full package, fastest turnaround. Priced on your free call.
  • Everything in Standard
  • 3D rendering
  • Garage conversion alt plan
  • HOA submission package
  • Coastal Zone supplement
  • 2 rounds of revisions
  • Priority 5-day turnaround
Check My Eligibility →

Want Your Miami Beach ADU Fully Done For You?

Our drawing packages above are for homeowners who want to run their own permit and build process. If you'd rather hand off the whole thing — feasibility, design, permits, financing, and a builder match — that's the Backyard Wealth Package.

Backyard Wealth Package

We turn your backyard into a rental unit. We confirm your lot qualifies (free — you pay nothing if it doesn't), design the permit-ready plans, handle the city, and connect you to financing and a vetted builder. One flat fee — about what an architect charges just to start. Yours would rent around $2,950/mo.

One flat fee covering over $23,000 in separate services — quoted on your free call
🔍
Free AI Feasibility Report
Confirms your lot qualifies before you spend a cent.
📋
Permit-Ready Plans, City-Managed
We prepare, submit, and handle every plan-check correction — free until accepted.
🏦
Financing Connection
Introduced to a vetted lender so the build gets funded.
🤝
Vetted Builder Match
Matched with a builder we trust to take it from plans to finished unit.
🔒
Price-Lock
Your scope, your price — locked before you start.

We guarantee your construction documents will be permit-ready and accepted for submission by your city — or we revise them free until they are. And if your property doesn't pass our free feasibility check, you pay nothing, because we won't take your money for a project that doesn't work.

Check My Miami Beach Property Free →

We won't even take your money unless your property qualifies.

Your Drawings in 3 Steps

01

Submit Your Project

Share your property address, lot dimensions, and ADU type. We'll confirm your order and assign your project coordinator.

02

We Draft Your Drawings

Our team designs your permit-ready drawing set — engineered for Miami Beach's building department requirements and FL code. Delivered in 10 business days.

03

Submit to Your City

Download your complete drawing package and submit directly to City of Miami Beach Building Department. We support corrections at no extra charge.

ADU Projects Completed with Build With A Plan

Three representative project scenarios based on actual drawing packages delivered in Florida cities with similar market conditions to Miami Beach.

Build costs reflect local construction data for Miami Beach. Client names are initials only. Permit timelines are project-specific and may vary.

Detached Backyard ADU
640 sq ft · Miami Beach
✓ Permitted
Build Cost
$208,000
Monthly Rent
$2,950/mo

"We'd been quoted $6,200 by a local firm for the same permit-ready set. Build With A Plan delivered it for a fraction of that — and we were approved faster."

— David & Lisa K. Permit: 7 weeks
Garage Conversion to ADU
480 sq ft · Miami-Dade County
✓ Permitted
Build Cost
$100,000
Monthly Rent
$2,050/mo

"Conversion permit came back approved on the first review. The drawings handled every detail — egress, HVAC, electrical. Nothing was missing."

— Sandra C. Permit: 6 weeks
Junior ADU (JADU)
490 sq ft · Miami Beach
✓ Permitted
Build Cost
$119,438
Monthly Rent
$2,050/mo

"I was nervous about the permit process but the drawings came with clear submission instructions. Approved without a single correction cycle."

— Patricia M. Permit: 5 weeks

Representative scenarios. Build costs modeled using Miami Beach construction data (city-verified data) and City of Miami Beach Building Department. Outcomes vary by project scope and site conditions.

Miami Beach Climate Zone & Energy Code

Climate Zone
Zone 1A
IECC climate zone
Seismic Zone
Seismic Design Category A (SDC A) per ASCE 7 / IBC — very low seismicity
Structural design req.
Florida Energy Code Compliance

Florida Energy Code (Florida Building Code - Energy): State energy code (Florida Energy Conservation Code) adopted as part of the FBC; requires compliance with statewide residential energy-efficiency provisions for envelope, HVAC, lighting and hot water systems — ADUs must meet the same residential energy provisions as other dwelling units.

Miami Beach vs. Nearby Florida Cities

CityBuild Cost/sqftPermit Fees1BR ADU RentCap RateEligibility
Miami Beach ← you $325 $2,500+ $2,950/mo 5.8% Free check →
Miami $250 $2,500+ $2,550/mo 5% View →
Hialeah $300 $2,500+ $1,897/mo 5.8% View →
Miami Gardens $260 $4,041+ $1,475/mo 5.8% View →
Homestead $300 $1,928+ $1,422/mo 6.8% View →

Miami Beach ADU Questions

How much does it cost to build an ADU in Miami Beach? +
Construction costs in Miami Beach average $325 per square foot based on 2025 data. A typical 600 sq ft ADU runs approximately $195,000, while a 1,000 sq ft unit costs around $325,000. Garage conversions start lower, around $100,000 base.
What is the maximum ADU size allowed in Miami Beach? +
Miami Beach permits ADUs up to 1,500 sq ft. The maximum height is 20 ft. Side setbacks are 8 ft and rear setbacks are 8 ft. Florida has no statewide ADU size mandate — the local ordinance shown above governs.
How long does the ADU permit process take in Miami Beach? +
Plan check in Miami Beach typically takes 7 weeks (estimated — Florida has no statewide ADU average tracked). Permit fees range from $2,500 to $10,000 (estimated). Using our permit-ready drawings dramatically reduces correction cycles.
Do I need owner-occupancy to build an ADU in Miami Beach? +
No — Miami Beach does not require owner-occupancy for ADUs. You can rent both the main house and the ADU as investment properties.
What's the rental income potential for an ADU in Miami Beach? +
In Miami Beach, a 1-bedroom ADU rents for approximately $2,950/month. Studios average $2,050 and 2-bedroom units bring $5,300. With an occupancy rate of 96%, annual gross rent on a 1BR ADU would be approximately $33,984.
How much does it cost to get ADU drawings in Miami Beach? +
Our permit-ready ADU drawing packages for Miami Beach cover everything FL's building department requires — engineered to pass plan check on the first submittal. Contact us for current package details and pricing. 14-day money-back guarantee.
What drawings are required for an ADU permit in Miami Beach? +
Miami Beach's building department requires: a site plan, floor plans, elevations (all four sides), an electrical plan, and energy compliance documentation (Florida energy code). Our Standard package includes all of these. The Premium package adds structural plans with engineer stamp — required for detached ADUs in most Florida cities. All drawings are FL-code compliant and formatted for local submission.
Can I convert my garage to an ADU in Miami Beach? +
Yes. Garage conversions are one of the most cost-effective ADU options in Miami Beach. Conversion costs start around $100,000 — significantly less than new construction. The existing footprint counts toward ADU square footage limits. Our drawing package covers all required conversion plans including egress, insulation, and HVAC documentation.
Does Miami Beach have a coastal overlay for ADUs? +
Yes — parts of Miami Beach fall within the Coastal Overlay Zone, which requires a Coastal Development Permit (CDP) in addition to standard building permits. This can add 2–6 months to the timeline. Our drawings flag coastal requirements and are designed to meet both local and applicable state coastal zone management standards.
What neighborhoods in Miami Beach are best for ADU investment? +
Normandy Isles, Nautilus, La Gorce. High single-family home density with moderate lot sizes near Mount Sinai and relatively affordable median values make ADUs feasible and in-demand.
Is Miami Beach ADU-friendly? +
Miami Beach is governed by local zoning ordinances — Florida law (§163.31771) only encourages, but does not mandate, local ADU approval. Miami Beach allows ADUs up to 1,500 sq ft. Review process and timelines are set by local ordinance — confirm the current process with the City of Miami Beach Building Department before designing.
How much will an ADU increase my property value in Miami Beach? +
ADUs in Miami Beach typically increase property values by 25%. On a $630,000 home, that's an estimated $157,500 in added value. Cap rates average 5.8% in Miami Beach.
Can I use my Miami Beach ADU as a short-term rental (Airbnb / VRBO)? +
Miami Beach restricts short-term rentals (under 30 days) in ADUs. The unit can be rented long-term — a 12-month lease is the most straightforward path. Florida's statewide law (§509.032(7)) generally preempts local STR bans passed after June 1, 2011, so any restriction in Miami Beach is more likely a registration, safety, or occupancy condition than an outright ban — confirm current local rules.
Miami Beach has a high HOA rate (33%) — do I need HOA approval for an ADU? +
Approximately 33% of Miami Beach properties are in HOA-governed communities. Florida Statute §720.3035 limits HOA control over certain interior changes but does not preempt CC&Rs that ban ADUs outright — Florida HOAs generally retain the ability to restrict ADUs through their covenants. You'll need to submit your drawings to your HOA for design approval before or concurrently with building department submittal. Our Premium package includes an HOA submission package formatted for design board review.
Does Miami Beach's seismic zone affect ADU construction requirements? +
Miami Beach falls within Seismic Design Category Seismic Design Category A (SDC A) per ASCE 7 / IBC — very low seismicity. This means ADU foundations, anchor bolts, shear walls, and hold-downs must meet the Florida Building Code's wind-load and impact-resistance provisions (8th Edition) — including High-Velocity Hurricane Zone rules in Miami-Dade and Broward counties — required for detached ADUs and strongly recommended for garage conversions where the existing structure may not meet current seismic standards.
Where do I submit ADU plans in Miami Beach? +
City of Miami Beach Building Department handles ADU permit applications — online submission is available through the permit portal. Permit fees in Miami Beach range from $2,500 to $10,000 depending on project scope and valuation. Plan check typically takes 7 weeks. Our drawing sets are formatted specifically for Miami Beach's submittal requirements to minimize plan check cycles.

More Services in Miami Beach

Garage Conversion Drawings Convert your Miami Beach garage to permitted living space. View Package → Home Addition Drawings Room additions, second stories, and bump-outs for Miami Beach properties. View Package → Start Your Miami Beach Project Permit-ready drawings in 10 business days. 14-day money-back guarantee. Order Now →

Free · No Obligation

Not Sure If Your Miami Beach Lot Qualifies?

Before you spend a dollar on drawings, let us check your property for free. We'll tell you honestly whether your Miami Beach lot supports an ADU, what it could rent for, and what to do next — no pressure, no sales pitch.

Get My Free Feasibility Report →

Takes 60 seconds · Results in 48 hours · Already know what you need? See pricing ↑