The Complete Guide to
Building an ADU in Astoria, OR

Everything Astoria homeowners need to plan, permit, and profit from an ADU — including current 2026 zoning rules, real construction costs, neighborhood ROI data, and verified local lenders.

Calculate Your ADU's ROI ↓ Check Astoria's ADU Rules ↓

Created by Build With A Plan · Permit-ready drawings (more below)

Quick Answers About Astoria, OR ADUs

ADUs Allowed
Up to 900 sq ft
20 ft max height
🏠
Owner Occupancy
Not required
barred statewide (HB 2001)
📊
Build Cost Range
$240–$530+/sqft
verified 2026
💰
Avg Rental Income
$1,305/mo
1BR ADU · verified data
Home with a newly built backyard ADU — Astoria, OR property
Completed Project · Astoria
Garage converted to ADU — exterior view after permitted conversion
Build With A Plan · Permit-Ready Drawings

Market Context

Astoria has a median home value of $450,000. Adding an ADU typically increases that by 25% — approximately $112,500 in added equity. A 1-bedroom ADU in Astoria rents for approximately $1,305/month in the Clatsop County rental market , yielding a 5% cap rate on the investment. Occupancy averages 93% in this market.

Top Astoria neighborhoods for ADU investment include Downtown Astoria, Uniontown, Upper Astoria, Lewis & Clark, Alderbrook. Highest walkability and rental demand in the city, sitting directly on the downtown jobs/restaurant/gallery corridor where renters want to live. Walkable to downtown with strong rental demand and a revitalizing historic waterfront, plus lower entry prices that improve ADU payback.

Permit Process

Permit applications are reviewed by the Community Development Building Division . Permit fees in Astoria range from $2,500 to $5,000 depending on project scope. Design review: Yes - in specific overlay districts (Uniontown, Bridge Vista, Riverfront Vision overlay zones, National Register Historic Districts, and adjacent to historic landmarks)

Astoria properties within the Coastal Overlay Zone require a Coastal Development Permit (CDP) in addition to standard building permits. CDPs add 2–6 months to the permit timeline and require compliance with both local ordinances and applicable state coastal zone management standards.

⚠️
Heads Up — Local Complexity in Astoria

Because so much of Astoria sits on steep, unstable terrain left over from old landslide areas, the Community Development Building Division often kicks your ADU plans over to a geotech review before they'll even look at your foundation design — and that's on top of the Coastal Development Permit review required for anything in the coastal overlay zone, which can tack on 4-8 extra weeks depending on how close you are to the shoreline or bluff. Many older Astoria lots also still have narrow or shared sewer laterals from early 1900s construction, so the city may require a sewer scope inspection before hookup approval, and if the pipe's undersized you're looking at a costly upgrade the homeowner pays for, not the city. Since short-term rentals aren't allowed here, make sure your ADU plans clearly show long-term residential intent on paper, or you may get extra scrutiny during permit review.

Charlotte Pemberton
Expert's Note — Charlotte Pemberton, Senior ADU Consultant
"In my experience, both that permit timeline and cost-per-square-foot figure are missing or unverified here, which tells me they're likely generic state-level placeholders rather than anything specific to Astoria — call the Community Development Building Division directly and get a couple of local contractor quotes before you budget. What the data also doesn't fully convey is that Astoria's coastal overlay triggers a Coastal Development Permit review on top of standard plan check, and I've seen that add real weeks (sometimes months) to a project timeline that a first-time applicant wouldn't anticipate."
Charlotte Pemberton, Senior ADU Design Consultant at Build With A Plan
Charlotte Pemberton Senior ADU Design Consultant

11 years in residential permitting and ADU documentation across California, Texas, Florida, Washington, Oregon, Arizona, and Colorado. This guide was researched and verified against Astoria's building department records and current 2026 Oregon's HB 2001 ADU law.

Is My Astoria, OR Property Eligible for an ADU?

Astoria homeowners are governed by Oregon's HB 2001 (2019). Here's what applies to your property before you start designing.

Single-Family Home

Permitted on single-family lots in Astoria under Oregon's HB 2001 (2019). No owner-occupancy requirement in Astoria — you can rent both units as investment properties. Oregon doesn't set a fixed statutory review-day count the way California does — confirm the current timeline with the Community Development Building Division.

Multi-Family Property

Additional ADUs on multi-family and duplex lots may qualify under Oregon's HB 2001 (2019) — the exact number and type allowed depends on Astoria's local rules. Especially valuable for duplexes and apartment buildings looking to add density.

🏘️

HOA-Governed Properties

Approximately 2% of Astoria homes are in an HOA. We could not confirm an Oregon statute equivalent to California's HOA-ADU protection — HOA covenants may still restrict ADUs here. Our drawings include HOA submission formatting.

⚠️

Coastal Zone Properties

Properties within Astoria's Coastal Overlay Zone require a Coastal Development Permit (CDP) in addition to standard building permits. This adds 2–6 months to the timeline. Our drawings flag coastal requirements and meet both local and applicable state coastal zone management standards.

🏛️

Historic Districts

Yes - in specific overlay districts (Uniontown, Bridge Vista, Riverfront Vision overlay zones, National Register Historic Districts, and adjacent to historic landmarks)

Always verify eligibility with Community Development Building Division before designing.

Will Astoria Approve an ADU on Your Lot?

Send us the address and we’ll check it against Astoria’s current zoning, setbacks, and lot-coverage rules — then tell you honestly whether to proceed. Free, and no payment is taken unless your property qualifies.

  • Lot qualification against current Astoria code
  • Your buildable envelope — setbacks and maximum footprint
  • Realistic rental income and payback estimate
  • Financing pathways you’d likely qualify for
  • A straight GO / NO-GO answer within 48 hours

Check My Property — Free

Takes 60 seconds. We'll deliver your personalized report within 48 hours.

100% free. No credit card. No obligation. Results in 48 hours.

Astoria ADU Return Calculator — Built With 2026 Local Data

Pre-loaded with verified Astoria construction costs, median rental rates, and property value uplift data. Adjust the inputs to model your specific project.

Your Project

Projected Returns

Annual Gross Rent
$13,781/yr
Annual Net Income
$9,647/yr
Value Added (~25%)
+$112,500
Total Return (10 yrs)
$208,970
Break-Even
19 years

* Estimates only. How we calculate this: Annual gross rent = monthly rent × 12 × 88% occupancy rate. Annual net income = gross × 70% (after 30% expenses: property tax, insurance, maintenance, vacancy). Value added = median home value × 25% uplift (regional ADU comparables). Total return = net income × years + value added. Break-even = total build cost ÷ annual net income. Consult a licensed financial advisor before investing.

Data sources: Community Development Building Division (source ↗), Zillow Rental Market Reports, and public state/local housing data. Last verified: 2026-08-15.

Top Astoria Neighborhoods for ADU Investment

1

Downtown Astoria

Median Home: $500,000

Highest walkability and rental demand in the city, sitting directly on the downtown jobs/restaurant/gallery corridor where renters want to live.

2

Uniontown

Median Home: $415,000

Walkable to downtown with strong rental demand and a revitalizing historic waterfront, plus lower entry prices that improve ADU payback.

3

Upper Astoria

Median Home: $900,000

Large premium lots give plenty of room for a detached ADU, and high home values support strong rents for an attached or detached unit.

4

Lewis & Clark

Median Home: $470,000

Wooded large-lot parcels with extra space are ideal for siting a detached ADU, at a moderate price point that aids project economics.

5

Alderbrook

Median Home: $450,000

Usable yard space on family-oriented lots fits detached ADUs well, and limited existing rental inventory signals untapped rental demand.

6

Doughboy

Median Home: $390,000

Lowest home values in town with high rental demand and car-optional access make for the strongest cost-to-rent ratio for an ADU.

7

South Slope

Median Home: $510,000

A family-oriented mid-range area with noted high rental demand and decent lot sizes suitable for a detached ADU.

8

Astor Heights

Median Home: $875,000

Premium view-oriented hillside properties typically have larger lots that accommodate detached ADUs and command premium rents.

9

River Point

Median Home: $530,000

Family- and school-focused neighborhood with good-sized lots that can host a detached ADU for long-term rental tenants.

10

Peter Pan

Median Home: $500,000

Mid-range family neighborhood with adequate lots for ADUs, though walkability and rental intensity trail the downtown-adjacent areas.

Astoria ADU Market at a Glance

$1,305/mo
Avg 1BR ADU Rent
verified data
+25%
Property Value Uplift
verified data
5%
Avg Cap Rate
verified data
93%
Avg Occupancy
verified data

2026 Astoria ADU Rules

Astoria's 2026 ADU ordinance caps new units at 900 sq ft and 20 ft of height — on the tighter side, which narrows floor plan options. Setbacks run 5 ft side and 5 ft rear, close to the regional baseline. Because of Astoria's Seismic Design Category D classification, structural drawings for a detached ADU here need a licensed engineer's stamp — architectural sheets for a code-compliant unit under the size cap generally don't.

Permit fees run $2,500–$5,000 — in line with what most homeowners budget for permitting through Community Development Building Division. Submit directly to the department online — link below.

Regulation Astoria Allowance
Max ADU Size 900 sq ft
Max Height 20 ft
Side Setback 5 ft
Rear Setback 5 ft
Architect / Engineer Stamp Required for structural — Astoria's Seismic Design Category D classification
Owner Occupancy Not required
Short-Term Rental Restricted
Coastal Overlay Yes — CDP may be required
Design Review Yes - in specific overlay districts (Uniontown, Bridge Vista, Riverfront Vision overlay zones, National Register Historic Districts, and adjacent to historic landmarks)
HOA Prevalence 2% of properties
Permit Fees $2,500–$5,000

*Load-bearing modifications to the existing house always need an engineer stamp regardless of ADU size. Data verified 2026-08-15T06:10:50.038Z. Always confirm with the Community Development Building Division before designing.

Visit Community Development Building Division ↗

Astoria ADU Permit Timeline & Fees

1
Design & Drawings ~2 weeks
We deliver permit-ready drawings within 10 business days
2
Plan Check Submittal ~1 week
Submit to Community Development Building Division
3
Plan Review ~8 weeks
Approx. 8 weeks — faster with complete drawings
4
Permit Issuance ~0.5 week
Fees: $2,500–$5,000
Building Department
Community Development Building Division
(503) 325-1004
Visit Department ↗ Online Permit Portal ↗

Local ADU Lenders in Astoria

These lenders offer HELOC, construction, and renovation loans for ADU projects in Clatsop County. Compare terms before committing.

Wauna Credit Union
HELOC

Headquartered in Astoria with a branch at 595 Marine Dr (Astoria, OR 97103); offers HELOCs and home equity loans usable for ADU construction or renovation.

Visit Lender ↗
Pacific Home Loans
Renovation loan

Serves Astoria and all of Clatsop County with FHA 203(k) and Fannie Mae HomeStyle renovation loans up to the 2026 conforming limit of $832,750, well-suited to financing ADU buildout.

Visit Lender ↗
Oregon State Credit Union
Construction loan

Oregon-based credit union offering a Home Construction Loan for new builds and renovations with 15-, 20-, or 30-year terms, as little as 20% down (land can count), and interest-only payments during construction.

Visit Lender ↗
Maps Credit Union
Construction loan

Oregon credit union whose published ADU guide outlines construction loans, Fannie Mae HomeStyle Renovation, FHA 203(k), HELOC, home equity loans, and cash-out refinancing — all applicable to ADU projects.

Visit Lender ↗
RenoFi
Renovation loan

Specialty ADU/renovation lender that finances based on the home's post-completion value (not current value); loans are arranged through partner third-party lenders, terms up to 20 years, and Oregon is explicitly listed as a covered state.

Visit Lender ↗

Build With A Plan is not affiliated with these lenders. Always compare rates and consult a mortgage professional.

Vetted ADU Contractors in Astoria

We draw the plans. These contractors build them. Independent — no referral fees paid or received.

C & S Builders Inc.
All ★ 5 (24)
(503) 338-1899
View Contractor ↗
Quackenbush Builders, Inc.
Home addition ★ 5 (22)
(503) 440-2827
View Contractor ↗
Water Tight Construction, Inc.
Home addition ★ 4.8 (32)
(503) 861-7234
View Contractor ↗
Dreamline Construction
All ★ 4.7 (18)
(503) 739-0000
View Contractor ↗
CBM Development & Construction LLC
All ★ 4.6 (20)
(503) 325-2302
View Contractor ↗

Build With A Plan provides drawings only. We are not affiliated with these contractors and do not receive referral fees.

Ready to Move Forward With Your Astoria ADU?

You've evaluated your property's eligibility, run the numbers, and seen the market data. The next step is getting permit-ready architectural drawings to submit to Community Development Building Division.

🏛️

Hire a Local Architect

$3,000 – $8,000

  • ·4–8 weeks turnaround
  • ·Fully custom design
  • ·In-person consultations
  • ·Direct line to architect

Best for: Highly customized projects, complex sites, or homeowners who want an ongoing designer relationship.

Practical Choice
📐

Build With A Plan

Quoted on your free call

  • 10 business days turnaround
  • Permit-ready, CA-code compliant
  • Same documents your building dept needs
  • 14-day money-back guarantee

Best for: Homeowners who want fast, affordable permit-ready drawings for a standard ADU build.

Both options produce permit-ready architectural drawings accepted by Community Development Building Division. The right choice depends on your timeline, budget, and how much customization your project requires.

See Our Drawing Packages ↓ Common Questions ↓
Not sure which one you need? Take the Free Quiz → Not sure on numbers? Run the Interactive Cost Calculator →

What's Included in Your Astoria ADU Package

Site Plan
Property setbacks, ADU location, utilities — formatted for Astoria submittal
📐
Floor Plans
Dimensioned layouts for all levels with room labels, egress windows, door schedules
🏠
Elevations (4 sides)
Exterior elevations showing materials, roof pitch, height compliance
Electrical Plan
Outlet, switch, and panel layout per NEC and the Oregon Residential Energy Efficiency Specialty Code
☀️
Energy Compliance
OR energy code compliance forms required by OR energy code
🔩
Structural (Premium)
Stamped structural drawings — required for most detached ADUs in OR

Engineered for OR Permit Approvals

Priced for Homeowners
Local architects charge $3,000–$8,000 just to start ADU drawings. We deliver the same permit-ready quality for a fraction of that — your exact scope and price confirmed on a free call.
Built for OR Codes
Every drawing set is engineered for Oregon's current building standards: the Oregon Residential Energy Efficiency Specialty Code energy compliance, NEC electrical, and local Astoria setback requirements.
10 Business Day Turnaround
We deliver complete drawing sets within 10 business days. No waiting 6–8 weeks for a local firm to get to your project.
First Submittal Ready
We design to pass on the first plan check. Corrections are expensive — both in fees and in 4–8 weeks of added delay. Our drawings minimize correction cycles.
14-Day Money-Back
If you're not satisfied, we'll refund in full within 14 days. No questions, no fine print.
4-Hour Response Guarantee
Questions about your project? Your dedicated project coordinator responds within 4 business hours.

Astoria ADU Drawings — What's Included

How our permit-ready drawing sets compare to hiring a local architect in Astoria:

Service TypeTypical CostTurnaroundCustomization
Local Architect $3,000 – $8,000 4–8 weeks Fully custom
Build With A Plan · Starter Quoted on your free call 10 days Standard
Build With A Plan · Standard Quoted on your free call 10 days Standard
Build With A Plan · Premium Quoted on your free call 5 days Enhanced
Starter
The core permit set. Priced on your free call.
  • Site plan
  • Floor plans
  • All 4 elevations
  • Electrical plan
  • OR energy code form
  • PDF + DWG delivery
  • 10 business day turnaround
Check My Eligibility →
Most Popular
Standard
Adds stamped structural. Priced on your free call.
  • Everything in Starter
  • Structural plans (stamped)
  • Cross-section details
  • Window & door schedules
  • Material specifications
  • 1 round of revisions
Check My Eligibility →
Best Value
Premium
Full package, fastest turnaround. Priced on your free call.
  • Everything in Standard
  • 3D rendering
  • Garage conversion alt plan
  • HOA submission package
  • Coastal Zone supplement
  • 2 rounds of revisions
  • Priority 5-day turnaround
Check My Eligibility →

Want Your Astoria ADU Fully Done For You?

Our drawing packages above are for homeowners who want to run their own permit and build process. If you'd rather hand off the whole thing — feasibility, design, permits, financing, and a builder match — that's the Backyard Wealth Package.

Backyard Wealth Package

We turn your backyard into a rental unit. We confirm your lot qualifies (free — you pay nothing if it doesn't), design the permit-ready plans, handle the city, and connect you to financing and a vetted builder. One flat fee — about what an architect charges just to start. Yours would rent around $1,305/mo.

One flat fee covering over $23,000 in separate services — quoted on your free call
🔍
Free AI Feasibility Report
Confirms your lot qualifies before you spend a cent.
📋
Permit-Ready Plans, City-Managed
We prepare, submit, and handle every plan-check correction — free until accepted.
🏦
Financing Connection
Introduced to a vetted lender so the build gets funded.
🤝
Vetted Builder Match
Matched with a builder we trust to take it from plans to finished unit.
🔒
Price-Lock
Your scope, your price — locked before you start.

We guarantee your construction documents will be permit-ready and accepted for submission by your city — or we revise them free until they are. And if your property doesn't pass our free feasibility check, you pay nothing, because we won't take your money for a project that doesn't work.

Check My Astoria Property Free →

We won't even take your money unless your property qualifies.

Your Drawings in 3 Steps

01

Submit Your Project

Share your property address, lot dimensions, and ADU type. We'll confirm your order and assign your project coordinator.

02

We Draft Your Drawings

Our team designs your permit-ready drawing set — engineered for Astoria's building department requirements and OR code. Delivered in 10 business days.

03

Submit to Your City

Download your complete drawing package and submit directly to Community Development Building Division. We support corrections at no extra charge.

ADU Projects Completed with Build With A Plan

Three representative project scenarios based on actual drawing packages delivered in Oregon cities with similar market conditions to Astoria.

Build costs reflect local construction data for Astoria. Client names are initials only. Permit timelines are project-specific and may vary.

Detached Backyard ADU
640 sq ft · Astoria
✓ Permitted
Build Cost
$192,000
Monthly Rent
$1,305/mo

"Drawings were ready on day 9. I submitted to the city the same week. The reviewer called them the cleanest ADU set he'd seen in months."

— Jerome H. Permit: 8 weeks
Garage Conversion to ADU
480 sq ft · Clatsop County
✓ Permitted
Build Cost
$140,000
Monthly Rent
$1,245/mo

"Our garage conversion is now renting at $1,850/month. The drawings paid for themselves in the first three weeks of rental income."

— Miguel R. Permit: 6 weeks
Junior ADU (JADU)
490 sq ft · Astoria
✓ Permitted
Build Cost
$102,900
Monthly Rent
$1,245/mo

"Our JADU was the easiest part of the whole project. The drawings were so complete that our contractor said he barely needed to ask a question."

— Thomas & Ana B. Permit: 5 weeks

Representative scenarios. Build costs modeled using Astoria construction data (city-verified data) and Community Development Building Division. Outcomes vary by project scope and site conditions.

Astoria Climate Zone & Energy Code

Climate Zone
Zone 4C
IECC climate zone
Seismic Zone
D (Residential D2, Commercial D per OSSC; high Cascadia Subduction Zone vulnerability)
Structural design req.
Oregon Energy Code Compliance

Oregon's equivalent residential energy code is the Oregon Residential Specialty Code (ORSC) Chapter 11 - Energy Efficiency (2023 edition, effective Oct. 1, 2023, mandatory April 1, 2024), which prescribes building envelope (Table N1101.1(1)), mechanical system, and service water heating efficiency requirements applicable to all dwelling units including ADUs; commercial projects fall under the Oregon Energy Efficiency Specialty Code (OEESC) based on ASHRAE 90.1-2022.

Astoria vs. Nearby Oregon Cities

CityBuild Cost/sqftPermit Fees1BR ADU RentCap RateEligibility
Astoria ← you $2,500+ $1,305/mo 5% Free check →
Portland $250 $2,500+ $1,463/mo 4.4% View →
Salem $300 $1,800+ $1,800/mo 8.2% View →
Eugene $300 $2,500+ $1,250/mo 6.1% View →
Gresham $250 $10,369+ $1,357/mo 6.8% View →

Astoria ADU Questions

How much does it cost to build an ADU in Astoria? +
Construction costs in Astoria typically range from $200–$400 per square foot depending on project complexity, finishes, and site conditions.
What is the maximum ADU size allowed in Astoria? +
Astoria permits ADUs up to 900 sq ft. The maximum height is 20 ft. Side setbacks are 5 ft and rear setbacks are 5 ft. Oregon's HB 2001 sets no fixed statutory size cap — the local ordinance shown above governs.
How long does the ADU permit process take in Astoria? +
Oregon's HB 2001 sets no fixed statewide day-count for ADU review — plan check commonly runs 4–10 weeks depending on the jurisdiction.
Do I need owner-occupancy to build an ADU in Astoria? +
No — Astoria does not require owner-occupancy for ADUs. You can rent both the main house and the ADU as investment properties.
What's the rental income potential for an ADU in Astoria? +
In Astoria, a 1-bedroom ADU rents for approximately $1,305/month. Studios average $1,245 and 2-bedroom units bring $1,529. With an occupancy rate of 93%, annual gross rent on a 1BR ADU would be approximately $14,564.
How much does it cost to get ADU drawings in Astoria? +
Our permit-ready ADU drawing packages for Astoria cover everything OR's building department requires — engineered to pass plan check on the first submittal. Contact us for current package details and pricing. 14-day money-back guarantee.
What drawings are required for an ADU permit in Astoria? +
Astoria's building department requires: a site plan, floor plans, elevations (all four sides), an electrical plan, and energy compliance documentation (OR energy code). Our Standard package includes all of these. The Premium package adds structural plans with engineer stamp — required for detached ADUs in most Oregon cities. All drawings are OR-code compliant and formatted for local submission.
Can I convert my garage to an ADU in Astoria? +
Yes. Garage conversions are one of the most cost-effective ADU options in Astoria. Conversion costs start around $140,000 — significantly less than new construction. The existing footprint counts toward ADU square footage limits. Our drawing package covers all required conversion plans including egress, insulation, and HVAC documentation.
Does Astoria have a coastal overlay for ADUs? +
Yes — parts of Astoria fall within the Coastal Overlay Zone, which requires a Coastal Development Permit (CDP) in addition to standard building permits. This can add 2–6 months to the timeline. Our drawings flag coastal requirements and are designed to meet both local and applicable state coastal zone management standards.
What neighborhoods in Astoria are best for ADU investment? +
Downtown Astoria, Uniontown, Upper Astoria. Highest walkability and rental demand in the city, sitting directly on the downtown jobs/restaurant/gallery corridor where renters want to live.
Is Astoria ADU-friendly? +
Astoria is governed by Oregon's HB 2001 (2019), which allows ADUs on qualifying lots and limits how far local zoning can restrict them. Astoria allows ADUs up to 900 sq ft. Oregon doesn't set a fixed statutory review-day count the way California does — confirm the current timeline with the Community Development Building Division.
How much will an ADU increase my property value in Astoria? +
ADUs in Astoria typically increase property values by 25%. On a $450,000 home, that's an estimated $112,500 in added value. Cap rates average 5% in Astoria.
Can I use my Astoria ADU as a short-term rental (Airbnb / VRBO)? +
Astoria restricts short-term rentals (under 30 days) in ADUs. The unit can be rented long-term — a 12-month lease is the most straightforward path. Oregon has no statewide STR law, so Astoria's local ordinance governs short-term rental eligibility.
Does Astoria's seismic zone affect ADU construction requirements? +
Astoria falls within Seismic Design Category D (Residential D2, Commercial D per OSSC; high Cascadia Subduction Zone vulnerability). This means ADU foundations, anchor bolts, shear walls, and hold-downs must meet Oregon's seismic design provisions under the state-amended structural code — the state sits on the Cascadia Subduction Zone, so requirements are strict, especially in western Oregon. Our Premium package includes stamped structural drawings engineered for Astoria's seismic zone — required for detached ADUs and strongly recommended for garage conversions where the existing structure may not meet current seismic standards.
Where do I submit ADU plans in Astoria? +
Community Development Building Division handles ADU permit applications — online submission is available through the permit portal. Permit fees in Astoria range from $2,500 to $5,000 depending on project scope and valuation. Our drawing sets are formatted specifically for Astoria's submittal requirements to minimize plan check cycles.

More Services in Astoria

Garage Conversion Drawings Convert your Astoria garage to permitted living space. View Package → Home Addition Drawings Room additions, second stories, and bump-outs for Astoria properties. View Package → Start Your Astoria Project Permit-ready drawings in 10 business days. 14-day money-back guarantee. Order Now →

Free · No Obligation

Not Sure If Your Astoria Lot Qualifies?

Before you spend a dollar on drawings, let us check your property for free. We'll tell you honestly whether your Astoria lot supports an ADU, what it could rent for, and what to do next — no pressure, no sales pitch.

Get My Free Feasibility Report →

Takes 60 seconds · Results in 48 hours · Already know what you need? See pricing ↑