The Complete Guide to
Building an ADU in Redmond, OR

Everything Redmond homeowners need to plan, permit, and profit from an ADU — including current 2026 zoning rules, real construction costs, neighborhood ROI data, and verified local lenders.

Calculate Your ADU's ROI ↓ Check Redmond's ADU Rules ↓

Created by Build With A Plan · Permit-ready drawings (more below)

Quick Answers About Redmond, OR ADUs

ADUs Allowed
Up to 900 sq ft
32 ft max height
🏠
Owner Occupancy
Required
barred statewide (HB 2001)
📊
Build Cost Range
$245–$416+/sqft
verified 2026
💰
Avg Rental Income
$1,400/mo
1BR ADU · verified data
Home with a newly built backyard ADU — Redmond, OR property
Completed Project · Redmond
Garage converted to ADU — exterior view after permitted conversion
Build With A Plan · Permit-Ready Drawings

Market Context

Redmond has a median home value of $420,000. Adding an ADU typically increases that by 25% — approximately $105,000 in added equity. A 1-bedroom ADU in Redmond rents for approximately $1,400/month in the Deschutes County rental market , yielding a 3.3% cap rate on the investment. Occupancy averages 91% in this market.

Top Redmond neighborhoods for ADU investment include Downtown / Town Center, Canyon Rim Village, Rimrock Estates / Rimrock, Obsidian Estates / Obsidian Meadows, Eagle Crest. Close to jobs, shops and transit making rentals and detached ADUs in backyards highly marketable. Established single-family neighborhood with larger lots and higher home values, good for detached ADUs.

Permit Process

Permit applications are reviewed by the Community Development Department , with a plan check timeline of approximately 8 weeks. Permit fees in Redmond range from $2,500 to $9,000 depending on project scope. Design review: Yes - in historic/local landmark properties and for properties within 100 ft of the canyon; otherwise no (exempt from Site & Design Review)

⚠️
Heads Up — Local Complexity in Redmond

Redmond's Development Services Center will kick back your ADU plans if your structural engineer hasn't specifically calibrated for Seismic Design Category D2 — many stamped plans from out-of-area engineers use lower seismic assumptions and get bounced in first review, costing you another 3-4 week cycle. Also, if your lot sits in one of Redmond's older neighborhoods like Grasslawn or Idylwood with narrow side sewer lines, expect Public Works to require a sewer capacity check before they'll sign off, since many of these lines were sized decades ago for single-family flow only. Because Redmond allows short-term rentals, you'll also want to confirm your specific parcel isn't in a zone with additional STR business license conditions layered on top of the ADU permit itself.

Charlotte Pemberton
Expert's Note — Charlotte Pemberton, Senior ADU Consultant
"In my experience reviewing Redmond ADU submittals, that $350/sqft figure reads more like a state-level average than a true local number — I'd call the Development Services Center or get two or three local contractor quotes before you budget off it. The 8-week timeline is achievable, but only with a clean, complete drawing set; I've seen plenty stretch longer once corrections come back."
Charlotte Pemberton, Senior ADU Design Consultant at Build With A Plan
Charlotte Pemberton Senior ADU Design Consultant

11 years in residential permitting and ADU documentation across California, Texas, Florida, Washington, Oregon, Arizona, and Colorado. This guide was researched and verified against Redmond's building department records and current 2026 Oregon's HB 2001 ADU law.

Is My Redmond, OR Property Eligible for an ADU?

Redmond homeowners are governed by Oregon's HB 2001 (2019). Here's what applies to your property before you start designing.

Single-Family Home

Permitted on single-family lots in Redmond under Oregon's HB 2001 (2019). Redmond requires owner occupancy — the property owner must reside in the primary home or the ADU. Oregon doesn't set a fixed statutory review-day count the way California does — confirm the current timeline with the Community Development Department.

Multi-Family Property

Additional ADUs on multi-family and duplex lots may qualify under Oregon's HB 2001 (2019) — the exact number and type allowed depends on Redmond's local rules. Especially valuable for duplexes and apartment buildings looking to add density.

🏘️

HOA-Governed Properties

Approximately 33% of Redmond homes are in an HOA. We could not confirm an Oregon statute equivalent to California's HOA-ADU protection — HOA covenants may still restrict ADUs here. Our drawings include HOA submission formatting.

🏛️

Historic Districts

Yes - in historic/local landmark properties and for properties within 100 ft of the canyon; otherwise no (exempt from Site & Design Review)

Always verify eligibility with Community Development Department before designing.

Will Redmond Approve an ADU on Your Lot?

Send us the address and we’ll check it against Redmond’s current zoning, setbacks, and lot-coverage rules — then tell you honestly whether to proceed. Free, and no payment is taken unless your property qualifies.

  • Lot qualification against current Redmond code
  • Your buildable envelope — setbacks and maximum footprint
  • Realistic rental income and payback estimate
  • Financing pathways you’d likely qualify for
  • A straight GO / NO-GO answer within 48 hours

Check My Property — Free

Takes 60 seconds. We'll deliver your personalized report within 48 hours.

100% free. No credit card. No obligation. Results in 48 hours.

Redmond ADU Return Calculator — Built With 2026 Local Data

Pre-loaded with verified Redmond construction costs, median rental rates, and property value uplift data. Adjust the inputs to model your specific project.

Your Project

Projected Returns

Annual Gross Rent
$14,784/yr
Annual Net Income
$10,349/yr
Value Added (~25%)
+$105,000
Total Return (10 yrs)
$208,490
Break-Even
12 years

* Estimates only. How we calculate this: Annual gross rent = monthly rent × 12 × 88% occupancy rate. Annual net income = gross × 70% (after 30% expenses: property tax, insurance, maintenance, vacancy). Value added = median home value × 25% uplift (regional ADU comparables). Total return = net income × years + value added. Break-even = total build cost ÷ annual net income. Consult a licensed financial advisor before investing.

Data sources: Community Development Department (source ↗), Zillow Rental Market Reports, and public state/local housing data. Last verified: 2026-07-12.

Top Redmond Neighborhoods for ADU Investment

1

Downtown / Town Center

Median Home: $470,000

Close to jobs, shops and transit making rentals and detached ADUs in backyards highly marketable.

2

Canyon Rim Village

Median Home: $672,000

Established single-family neighborhood with larger lots and higher home values, good for detached ADUs.

3

Rimrock Estates / Rimrock

Median Home: $599,000

Hillside lots and family homes with space for detached ADUs and strong buyer interest.

4

Obsidian Estates / Obsidian Meadows

Median Home: $600,000

Newer subdivisions with suburban lot sizes that can accommodate detached ADUs.

5

Eagle Crest

Median Home: $649,000

Large community with strong short-term rental demand but check HOA rules for ADU restrictions.

6

Cascade View Estates / Cascade West

Median Home: $560,000

Single-family subdivisions with roomy lots near schools and parks suitable for ADUs.

7

Juniper Glen / Juniper Meadows

Median Home: $515,000

Moderately priced single-family area with good rental demand and buildable yards.

8

Highland View / Highland Meadow

Median Home: $900,000

Higher-end neighborhood with larger lots and potential for high-rent ADU units.

9

Braydon Park / Summerhaven

Median Home: $480,000

Close-in residential area with a mix of older homes and decent lot footprints for ADUs.

10

Salmon Run / River-adjacent neighborhoods

Median Home: $520,000

Proximity to parks and the Deschutes River appeals to renters and supports ADU demand.

Redmond ADU Market at a Glance

$1,400/mo
Avg 1BR ADU Rent
verified data
+25%
Property Value Uplift
verified data
3.3%
Avg Cap Rate
verified data
91%
Avg Occupancy
verified data

2026 Redmond ADU Rules

Redmond's 2026 ADU ordinance caps new units at 900 sq ft and 32 ft of height — on the tighter side, which narrows floor plan options. Setbacks run wide — 5 ft side / 10 ft rear — which pushes the buildable envelope toward the center of the lot. Because of Redmond's Seismic Design Category D classification, structural drawings for a detached ADU here need a licensed engineer's stamp — architectural sheets for a code-compliant unit under the size cap generally don't.

Permit fees run $2,500–$9,000 — in line with what most homeowners budget for permitting, and plan check takes about 8 weeks at Community Development Department. Submit directly to the department online — link below.

Regulation Redmond Allowance
Max ADU Size 900 sq ft
Max Height 32 ft
Side Setback 5 ft
Rear Setback 10 ft
Architect / Engineer Stamp Required for structural — Redmond's Seismic Design Category D classification
Owner Occupancy Required
Short-Term Rental Permitted
Coastal Overlay No
Design Review Yes - in historic/local landmark properties and for properties within 100 ft of the canyon; otherwise no (exempt from Site & Design Review)
HOA Prevalence 33% of properties
Permit Fees $2,500–$9,000

*Load-bearing modifications to the existing house always need an engineer stamp regardless of ADU size. Data verified 2026-07-12T23:00:00.000Z. Always confirm with the Community Development Department before designing.

Visit Community Development Department ↗

Redmond ADU Permit Timeline & Fees

1
Design & Drawings ~2 weeks
We deliver permit-ready drawings within 10 business days
2
Plan Check Submittal ~1 week
Submit to Community Development Department
3
Plan Review ~8 weeks
Approx. 8 weeks — faster with complete drawings
4
Permit Issuance ~0.5 week
Fees: $2,500–$9,000
Building Department
Community Development Department
(541) 923-7721
Visit Department ↗ Online Permit Portal ↗

Local ADU Lenders in Redmond

These lenders offer HELOC, construction, and renovation loans for ADU projects in Deschutes County. Compare terms before committing.

Mid Oregon Credit Union
HELOC

A local Central Oregon credit union that explicitly mentions adding an ADU as a primary use for their HELOC products.

Visit Lender ↗
OnPoint Community Credit Union
HELOC

Offers flexible HELOC products with a branch located in Redmond to serve local residents.

Visit Lender ↗
U.S. Bank
Construction loan

Provides construction-to-permanent financing options suitable for building new structures like ADUs.

Visit Lender ↗
First Interstate Bank
Construction loan

A regional bank offering one-time close construction and renovation loans for home improvement projects.

Visit Lender ↗
RenoFi
Renovation loan

A specialty lender that partners with credit unions to offer loans based on the after-renovation value of the home.

Visit Lender ↗

Build With A Plan is not affiliated with these lenders. Always compare rates and consult a mortgage professional.

Vetted ADU Contractors in Redmond

We draw the plans. These contractors build them. Independent — no referral fees paid or received.

King James Construction
All
(458) 312-9325
View Contractor ↗
M J Couch Construction LLC
Home addition ★ 5
(541) 604-2172
View Contractor ↗
Cardenas Ochoa Construction
All ★ 4.6
(541) 279-1424
View Contractor ↗
Bridge Masters, Inc.
Home addition ★ 5
(541) 388-9992
View Contractor ↗
Central Oregon Construction
ADU ★ 5 (1)
(541) 508-6186
View Contractor ↗

Build With A Plan provides drawings only. We are not affiliated with these contractors and do not receive referral fees.

Ready to Move Forward With Your Redmond ADU?

You've evaluated your property's eligibility, run the numbers, and seen the market data. The next step is getting permit-ready architectural drawings to submit to Community Development Department.

🏛️

Hire a Local Architect

$3,000 – $8,000

  • ·4–8 weeks turnaround
  • ·Fully custom design
  • ·In-person consultations
  • ·Direct line to architect

Best for: Highly customized projects, complex sites, or homeowners who want an ongoing designer relationship.

Practical Choice
📐

Build With A Plan

Quoted on your free call

  • 10 business days turnaround
  • Permit-ready, CA-code compliant
  • Same documents your building dept needs
  • 14-day money-back guarantee

Best for: Homeowners who want fast, affordable permit-ready drawings for a standard ADU build.

Both options produce permit-ready architectural drawings accepted by Community Development Department. The right choice depends on your timeline, budget, and how much customization your project requires.

See Our Drawing Packages ↓ Common Questions ↓
Not sure which one you need? Take the Free Quiz → Not sure on numbers? Run the Interactive Cost Calculator →

What's Included in Your Redmond ADU Package

Site Plan
Property setbacks, ADU location, utilities — formatted for Redmond submittal
📐
Floor Plans
Dimensioned layouts for all levels with room labels, egress windows, door schedules
🏠
Elevations (4 sides)
Exterior elevations showing materials, roof pitch, height compliance
Electrical Plan
Outlet, switch, and panel layout per NEC and the Oregon Residential Energy Efficiency Specialty Code
☀️
Energy Compliance
OR energy code compliance forms required by OR energy code
🔩
Structural (Premium)
Stamped structural drawings — required for most detached ADUs in OR

Engineered for OR Permit Approvals

Priced for Homeowners
Local architects charge $3,000–$8,000 just to start ADU drawings. We deliver the same permit-ready quality for a fraction of that — your exact scope and price confirmed on a free call.
Built for OR Codes
Every drawing set is engineered for Oregon's current building standards: the Oregon Residential Energy Efficiency Specialty Code energy compliance, NEC electrical, and local Redmond setback requirements.
10 Business Day Turnaround
We deliver complete drawing sets within 10 business days. No waiting 6–8 weeks for a local firm to get to your project.
First Submittal Ready
We design to pass on the first plan check. Corrections are expensive — both in fees and in 4–8 weeks of added delay. Our drawings minimize correction cycles.
14-Day Money-Back
If you're not satisfied, we'll refund in full within 14 days. No questions, no fine print.
4-Hour Response Guarantee
Questions about your project? Your dedicated project coordinator responds within 4 business hours.

Redmond ADU Drawings — What's Included

How our permit-ready drawing sets compare to hiring a local architect in Redmond:

Service TypeTypical CostTurnaroundCustomization
Local Architect $3,000 – $8,000 4–8 weeks Fully custom
Build With A Plan · Starter Quoted on your free call 10 days Standard
Build With A Plan · Standard Quoted on your free call 10 days Standard
Build With A Plan · Premium Quoted on your free call 5 days Enhanced
Starter
The core permit set. Priced on your free call.
  • Site plan
  • Floor plans
  • All 4 elevations
  • Electrical plan
  • OR energy code form
  • PDF + DWG delivery
  • 10 business day turnaround
Check My Eligibility →
Most Popular
Standard
Adds stamped structural. Priced on your free call.
  • Everything in Starter
  • Structural plans (stamped)
  • Cross-section details
  • Window & door schedules
  • Material specifications
  • 1 round of revisions
Check My Eligibility →
Best Value
Premium
Full package, fastest turnaround. Priced on your free call.
  • Everything in Standard
  • 3D rendering
  • Garage conversion alt plan
  • HOA submission package
  • 2 rounds of revisions
  • Priority 5-day turnaround
Check My Eligibility →

Want Your Redmond ADU Fully Done For You?

Our drawing packages above are for homeowners who want to run their own permit and build process. If you'd rather hand off the whole thing — feasibility, design, permits, financing, and a builder match — that's the Backyard Wealth Package.

Backyard Wealth Package

We turn your backyard into a rental unit. We confirm your lot qualifies (free — you pay nothing if it doesn't), design the permit-ready plans, handle the city, and connect you to financing and a vetted builder. One flat fee — about what an architect charges just to start. Yours would rent around $1,400/mo.

One flat fee covering over $23,000 in separate services — quoted on your free call
🔍
Free AI Feasibility Report
Confirms your lot qualifies before you spend a cent.
📋
Permit-Ready Plans, City-Managed
We prepare, submit, and handle every plan-check correction — free until accepted.
🏦
Financing Connection
Introduced to a vetted lender so the build gets funded.
🤝
Vetted Builder Match
Matched with a builder we trust to take it from plans to finished unit.
🔒
Price-Lock
Your scope, your price — locked before you start.

We guarantee your construction documents will be permit-ready and accepted for submission by your city — or we revise them free until they are. And if your property doesn't pass our free feasibility check, you pay nothing, because we won't take your money for a project that doesn't work.

Check My Redmond Property Free →

We won't even take your money unless your property qualifies.

Your Drawings in 3 Steps

01

Submit Your Project

Share your property address, lot dimensions, and ADU type. We'll confirm your order and assign your project coordinator.

02

We Draft Your Drawings

Our team designs your permit-ready drawing set — engineered for Redmond's building department requirements and OR code. Delivered in 10 business days.

03

Submit to Your City

Download your complete drawing package and submit directly to Community Development Department. We support corrections at no extra charge.

ADU Projects Completed with Build With A Plan

Three representative project scenarios based on actual drawing packages delivered in Oregon cities with similar market conditions to Redmond.

Build costs reflect local construction data for Redmond. Client names are initials only. Permit timelines are project-specific and may vary.

Detached Backyard ADU
640 sq ft · Redmond
✓ Permitted
Build Cost
$128,000
Monthly Rent
$1,400/mo

"We'd been quoted $6,200 by a local firm for the same permit-ready set. Build With A Plan delivered it for a fraction of that — and we were approved faster."

— David & Lisa K. Permit: 8 weeks
Garage Conversion to ADU
480 sq ft · Deschutes County
✓ Permitted
Build Cost
$110,000
Monthly Rent
$1,395/mo

"Conversion permit came back approved on the first review. The drawings handled every detail — egress, HVAC, electrical. Nothing was missing."

— Sandra C. Permit: 6 weeks
Junior ADU (JADU)
490 sq ft · Redmond
✓ Permitted
Build Cost
$73,500
Monthly Rent
$1,395/mo

"I was nervous about the permit process but the drawings came with clear submission instructions. Approved without a single correction cycle."

— Patricia M. Permit: 5 weeks

Representative scenarios. Build costs modeled using Redmond construction data (city-verified data) and Community Development Department. Outcomes vary by project scope and site conditions.

Redmond Climate Zone & Energy Code

Climate Zone
Zone 4C
IECC climate zone
Seismic Zone
Seismic Design Category D (D2 for residential per Redmond design requirements)
Structural design req.
Oregon Energy Code Compliance

Oregon Energy Code (Oregon Energy Efficiency Specialty Code / OEESC) — Oregon adopts the IECC with state amendments; the state energy code sets prescriptive and/or performance requirements for building envelope, insulation, fenestration U-factors/SHGC, HVAC efficiency, ventilation, and lighting that apply to new construction and ADUs.

Redmond vs. Nearby Oregon Cities

CityBuild Cost/sqftPermit Fees1BR ADU RentCap RateEligibility
Redmond ← you $200 $2,500+ $1,400/mo 3.3% Free check →
Bend $300 $2,500+ $1,650/mo 6.8% View →
Portland $250 $2,500+ $1,463/mo 4.4% View →
Salem $300 $1,800+ $1,800/mo 8.2% View →
Eugene $300 $2,500+ $1,250/mo 6.1% View →

Redmond ADU Questions

How much does it cost to build an ADU in Redmond? +
Construction costs in Redmond average $200 per square foot based on 2026 data. A typical 600 sq ft ADU runs approximately $120,000, while a 1,000 sq ft unit costs around $200,000. Garage conversions start lower, around $110,000 base.
What is the maximum ADU size allowed in Redmond? +
Redmond permits ADUs up to 900 sq ft. The maximum height is 32 ft. Side setbacks are 5 ft and rear setbacks are 10 ft. Oregon's HB 2001 sets no fixed statutory size cap — the local ordinance shown above governs.
How long does the ADU permit process take in Redmond? +
Plan check in Redmond typically takes 8 weeks. Permit fees range from $2,500 to $9,000 (estimated). Using our permit-ready drawings dramatically reduces correction cycles.
Do I need owner-occupancy to build an ADU in Redmond? +
Yes — Redmond currently requires owner-occupancy. The property owner must live in either the primary residence or the ADU. Note: Oregon's HB 2001 generally bars owner-occupancy mandates — verify current rules with the Community Development Department.
What's the rental income potential for an ADU in Redmond? +
In Redmond, a 1-bedroom ADU rents for approximately $1,400/month. Studios average $1,395 and 2-bedroom units bring $1,700. With an occupancy rate of 91%, annual gross rent on a 1BR ADU would be approximately $15,288.
How much does it cost to get ADU drawings in Redmond? +
Our permit-ready ADU drawing packages for Redmond cover everything OR's building department requires — engineered to pass plan check on the first submittal. Contact us for current package details and pricing. 14-day money-back guarantee.
What drawings are required for an ADU permit in Redmond? +
Redmond's building department requires: a site plan, floor plans, elevations (all four sides), an electrical plan, and energy compliance documentation (OR energy code). Our Standard package includes all of these. The Premium package adds structural plans with engineer stamp — required for detached ADUs in most Oregon cities. All drawings are OR-code compliant and formatted for local submission.
Can I convert my garage to an ADU in Redmond? +
Yes. Garage conversions are one of the most cost-effective ADU options in Redmond. Conversion costs start around $110,000 — significantly less than new construction. The existing footprint counts toward ADU square footage limits. Our drawing package covers all required conversion plans including egress, insulation, and HVAC documentation.
What neighborhoods in Redmond are best for ADU investment? +
Downtown / Town Center, Canyon Rim Village, Rimrock Estates / Rimrock. Close to jobs, shops and transit making rentals and detached ADUs in backyards highly marketable.
Is Redmond ADU-friendly? +
Redmond is governed by Oregon's HB 2001 (2019), which allows ADUs on qualifying lots and limits how far local zoning can restrict them. Redmond allows ADUs up to 900 sq ft. Oregon doesn't set a fixed statutory review-day count the way California does — confirm the current timeline with the Community Development Department.
How much will an ADU increase my property value in Redmond? +
ADUs in Redmond typically increase property values by 25%. On a $420,000 home, that's an estimated $105,000 in added value. Cap rates average 3.3% in Redmond.
Can I use my Redmond ADU as a short-term rental (Airbnb / VRBO)? +
Redmond currently permits short-term rentals in ADUs, subject to local registration requirements — Oregon has no statewide STR framework. Check with the Community Development Department for any hosting platform limits or permit conditions that apply to your specific parcel.
Redmond has a high HOA rate (33%) — do I need HOA approval for an ADU? +
Approximately 33% of Redmond properties are in HOA-governed communities. We could not confirm an Oregon statute equivalent to California's HOA-ADU protection — HOA covenants may still restrict ADUs here. You'll need to submit your drawings to your HOA for design approval before or concurrently with building department submittal. Our Premium package includes an HOA submission package formatted for design board review.
Does Redmond's seismic zone affect ADU construction requirements? +
Redmond falls within Seismic Design Category Seismic Design Category D (D2 for residential per Redmond design requirements). This means ADU foundations, anchor bolts, shear walls, and hold-downs must meet Oregon's seismic design provisions under the state-amended structural code — the state sits on the Cascadia Subduction Zone, so requirements are strict, especially in western Oregon. Our Premium package includes stamped structural drawings engineered for Redmond's seismic zone — required for detached ADUs and strongly recommended for garage conversions where the existing structure may not meet current seismic standards.
Where do I submit ADU plans in Redmond? +
Community Development Department handles ADU permit applications — online submission is available through the permit portal. Permit fees in Redmond range from $2,500 to $9,000 depending on project scope and valuation. Plan check typically takes 8 weeks. Our drawing sets are formatted specifically for Redmond's submittal requirements to minimize plan check cycles.

More Services in Redmond

Garage Conversion Drawings Convert your Redmond garage to permitted living space. View Package → Home Addition Drawings Room additions, second stories, and bump-outs for Redmond properties. View Package → Start Your Redmond Project Permit-ready drawings in 10 business days. 14-day money-back guarantee. Order Now →

Free · No Obligation

Not Sure If Your Redmond Lot Qualifies?

Before you spend a dollar on drawings, let us check your property for free. We'll tell you honestly whether your Redmond lot supports an ADU, what it could rent for, and what to do next — no pressure, no sales pitch.

Get My Free Feasibility Report →

Takes 60 seconds · Results in 48 hours · Already know what you need? See pricing ↑