Permit-Ready Garage Conversion
Drawings for Hurst, TX

Convert your garage into permitted living space or a rental unit. We deliver complete, code-compliant drawing sets ready for Hurst's building department — 14-day money-back guarantee.
Check If My Garage Qualifies → Conversion FAQ ↓

14-day money-back guarantee · 10 business day turnaround

Conversion Cost Range
$75,000 – $165,000
Hurst estimate
Drawing Package
Permit-Ready Set
contact us for pricing
Turnaround
10 Business Days
vs 4–8 weeks locally
Conversion Allowed
Yes
TX state law applies

What Hurst Homeowners Need to Know Before Submitting

Size & Zoning Rules

Converting your garage to a legal rental unit means the finished space must comply with Hurst's ADU size limits. Hurst's current ADU size cap is 1,000 sq ft — within the typical range for most floor plan configurations.

Hurst does not impose an owner-occupancy requirement, so you can rent both the main home and any ADU or conversion as investment units.

A fully permitted, code-compliant garage conversion in Hurst can command approximately $1,129/month as a 1-bedroom rental — far more than leaving the space as storage.

Permit Process & Fees

Community Development permit fees for this project type typically range from $1,275 to $1,775 depending on project valuation and scope.

Garage conversion drawings submitted to Community Development must include a site plan, floor plans, all four elevations, an electrical plan, and energy compliance documentation — plus stamped structural plans are typically required for converted garages that are detached or require seismic upgrades.

Visit Community Development ↗

Construction Cost Context

Hurst's garage conversion construction costs run $225–$338 per square foot — a wide range driven by labor markets, local code complexity, and finish level. Our drawings are priced at a fraction of what a full-service architect would charge to produce the same permit set.

⚠ Common Pitfall in Hurst

Community Development's flat fee sheet looks simple on paper, but it doesn't include the separate 4% inspection surcharge or the water/wastewater impact fee that Public Works Engineering tacks on for any new detached structure with its own plumbing — homeowners often budget $1,500 and get hit with closer to $2,500-$3,000 once those extras land. Because Hurst hasn't published a clear ADU-specific review timeline, plan check for a detached unit can stall for weeks while staff route it between building and engineering for the utility tie-in sign-off, especially if your lot backs up to an easement shared with DFW-area utility corridors common in this part of Tarrant County. Get the water/sewer impact fee quote in writing before you finalize your budget — it's the number that surprises most homeowners here.

Expert Verdict — Marcus Reid, Licensed Designer

"In my 11 years reviewing Hurst permits, I don't trust that blank timeline or cost figure as-is—both look like unverified state-level placeholders rather than anything specific to our local Community Development office, so call them directly and get a couple of local contractor quotes before you budget anything. With 20% HOA prevalence in the mix, even though STRs are technically allowed citywide, I've seen HOA covenants quietly override that and stall projects homeowners assumed were a green light."

Market Context

Hurst has a median home value of $320,000. Comparable renovation projects in this market typically add 25% to resale value.

Neighborhoods in Hurst with the strongest garage conversion and rental-unit potential include Hurst Hills, Woodland Springs, Brookhollow, Bellaire Park, Hurst Meadows. Highest-end estate area with the largest lots in Hurst, walking distance to Bell Helicopter/Textron and HEB ISD campuses driving premium professional renter demand.

Permit Process

Permit applications are reviewed by the Community Development. Permit fees in Hurst range from $1,275 to $1,775 depending on project scope. Design review: Yes - in historic districts only.

Hurst falls within Seismic Design Category A, which affects structural requirements for converted garage walls and foundations.

Local Garage Conversion Lenders in Hurst

These lenders offer HELOC, construction, and renovation loans for garage conversion projects in Tarrant County. Compare terms before committing.

Texas Trust Credit Union
HELOC

Home Equity Loan as low as 6.419% APR, up to 80% LTV, loans up to $250,000; serves Hurst and Tarrant County area.

Visit Lender ↗
Tarrant County's Credit Union (TCCU)
Construction loan

Offers 12-month interim construction loans with competitive fixed rates and interest-only payments during construction; plus home equity loans up to 80% LTV.

Visit Lender ↗
Credit Union of Texas (CUTX)
HELOC

Texas-based credit union HELOC; funds home improvement and renovation projects; pay interest only on funds drawn; up to 80% LTV per Texas law.

Visit Lender ↗
RenoFi
Renovation loan

Specialty ADU/renovation HELOC allowing borrowers to access up to $750,000 (up to 95% of after-renovation value); operates nationally including Texas.

Visit Lender ↗
First Community Credit Union (FCCU) with RenoFi
Renovation loan

FCCU + RenoFi partnership in Texas; borrow up to 90% of after-renovation value (max $350,000, Texas homesteads only).

Visit Lender ↗

Build With A Plan is not affiliated with these lenders. Always compare rates and consult a mortgage professional.

Vetted Garage Conversion Contractors in Hurst

We draw the plans. These contractors build the conversion. Independent — no referral fees paid or received.

Salvation Home Remodeling
All★ 5 (28)
(817) 210-7117
View Contractor ↗

Build With A Plan provides drawings only. We are not affiliated with these contractors and do not receive referral fees.

Can Your Hurst Garage Legally Become Living Space?

Not every garage qualifies. Send us the address and we’ll check ceiling height, setbacks, parking-replacement rules, and what Hurst will actually permit — before you spend anything.

  • Whether your garage meets Hurst conversion rules
  • Parking-replacement requirements that catch most owners out
  • Ceiling height, egress, and fire-separation checks
  • What the finished space could rent for
  • A straight answer within 48 hours

Check My Garage — Free

Takes 60 seconds. We'll deliver your personalized report within 48 hours.

100% free. No credit card. No obligation. Results in 48 hours.

What's Included in Your Hurst Garage Conversion Package

Site Plan
Existing garage footprint, setbacks, and lot layout formatted for Hurst submittal
📐
Floor Plans
Converted interior layout with new walls, entry door, egress window, and room dimensions
🏠
Elevations (4 sides)
Exterior views showing new door, window, and infilled garage door opening
Electrical Plan
Outlet, switch, lighting, and panel layout per NEC and applicable TX electrical code amendments
☀️
Energy Compliance
local energy code compliance — required for all habitable conversions in TX
🔩
Structural (Premium)
Stamped structural drawings for detached garages or where seismic upgrades are required

What's in Your Hurst Garage Conversion Package

One-time fee, no retainer, no hourly billing — your exact scope and price confirmed on a free call.

Starter
The core permit set. Priced on your free call.
  • Site plan
  • Floor plans
  • All 4 elevations
  • Electrical plan
  • local energy code form
  • PDF + DWG delivery
  • 10 business day turnaround
Check My Eligibility →
Most Popular
Standard
Adds stamped structural. Priced on your free call.
  • Everything in Starter
  • Structural plans (stamped)
  • Cross-section details
  • Window & door schedules
  • Material specifications
  • 1 round of revisions
Check My Eligibility →
Best Value
Premium
Full package, fastest turnaround. Priced on your free call.
  • Everything in Standard
  • 3D rendering
  • HOA submission package
  • ADU conversion alt plan
  • 2 rounds of revisions
  • Priority 5-day turnaround
Check My Eligibility →

Your Conversion Drawings in 3 Steps

01

Submit Your Garage Details

Share your property address, garage dimensions, and intended use (ADU, rental, home office). We confirm your order and assign your project coordinator within 4 business hours.

02

We Draft Your Drawings

Our team designs your complete conversion drawing set — engineered for Hurst's building department requirements and TX code. Delivered in 10 business days.

03

Submit to Your Building Dept

Download your complete package and submit to Community Development. We support plan check corrections at no extra charge.

Hurst Garage Conversion FAQs

Is a garage conversion allowed in Hurst? +

Yes — garage conversions are permitted in Hurst. Texas's local zoning ordinances allow homeowners to convert an attached or detached garage into habitable living space or an ADU. A building permit and permit-ready drawings are required before work begins.

How much does a garage conversion cost in Hurst? +

Garage conversions in Hurst typically range from $75,000 to $165,000 depending on the existing structure, finish level, and scope of work. This is significantly less than building a new detached ADU. Contact us to discuss drawing package options for your project.

What drawings are required to permit a garage conversion in Hurst? +

Hurst's building department requires: a site plan showing the converted garage's location on the lot, floor plans with dimensions and room labels, all four exterior elevations, an electrical plan, and energy compliance documentation (the locally adopted energy code). Our Starter package covers all of these. If the garage is detached or the structure requires seismic upgrades, stamped structural drawings are also required — included in our Premium package.

How long does the permit process take for a garage conversion in Hurst? +

Plan check in Hurst typically takes approximately 6 weeks. Having complete, code-compliant drawings dramatically reduces correction cycles — which each add 3–6 weeks. Our drawings are designed to pass on the first submittal.

Can I convert my garage into a rental unit in Hurst? +

Yes — a permitted garage conversion can function as a standalone rental unit (an ADU, or a similar accessory-unit category depending on Texas's and Hurst's local rules). It can be rented long-term. Short-term rental rules vary by city — confirm with Hurst's planning department.

Do I need to replace the garage door opening when converting? +

Yes. The garage door must be replaced with an insulated wall with a standard entry door and at least one egress window (minimum 5.7 sq ft clear opening). This is captured in our elevation drawings and flagged in the electrical plan. The new wall must also meet TX energy code requirements, which we handle in the local energy code compliance documentation.

How much does it cost to get garage conversion drawings in Hurst? +

Our permit-ready garage conversion drawing packages for Hurst include floor plans, elevations, electrical, and energy compliance — everything your building department needs. Every package is engineered for TX code compliance and formatted for Hurst's building department. 14-day money-back guarantee.

Will converting my garage increase my home's value in Hurst? +

A permitted garage conversion in Hurst adds rentable square footage to a home currently valued around $320,000. Converted spaces typically appraise as habitable square footage, increasing the home's value. As an ADU or JADU, the rental income stream is also capitalized into the appraised value — typically at a 5–6% cap rate.

Nearby Cities

Fort Worth Arlington North Richland Hills Mansfield

From the Blog

Garage Conversion Permit: Cost, Timeline, and How to Get One Approved Read the article → Convert Garage to Bedroom: Step-by-Step Guide and Full Cost Breakdown Read the article →

Also Available in Hurst

Need full ADU design drawings instead?

View ADU Design →

Ready to Move Forward With Your Hurst ADU?

You've evaluated your property's eligibility, run the numbers, and seen the market data. The next step is getting permit-ready architectural drawings to submit to Community Development.

🏛️

Hire a Local Architect

$3,000 – $8,000

  • ·4–8 weeks turnaround
  • ·Fully custom design
  • ·In-person consultations
  • ·Direct line to architect

Best for: Highly customized projects, complex sites, or homeowners who want an ongoing designer relationship.

Practical Choice
📐

Build With A Plan

Quoted on your free call

  • 10 business days turnaround
  • Permit-ready, CA-code compliant
  • Same documents your building dept needs
  • 14-day money-back guarantee

Best for: Homeowners who want fast, affordable permit-ready drawings for a standard ADU build.

Both options produce permit-ready architectural drawings accepted by Community Development. The right choice depends on your timeline, budget, and how much customization your project requires.

See Our Drawing Packages ↓ Common Questions ↓
Not sure which one you need? Take the Free Quiz → Not sure on numbers? Run the Interactive Cost Calculator →